The case for solar on a Droitwich holding turns on how much of the output the farm uses itself, not on how much the roof makes. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.
877 kWh per kWp a year at this latitude, so a 500 kWp array models at about 439,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in DroitwichIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Solar for agricultural buildings across Worcestershire
What a farm roof near Droitwich generates
Modelled irradiation at this latitude is 1126 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 877 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.
No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.
Droitwich ranks 3 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through National Grid Electricity Distribution
Connections around Droitwich are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.
Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Droitwich
- How much does a farm roof near Droitwich generate?
- The model gives 877 kWh for every kWp installed here, so 500 kWp comes out at about 439,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Will the rural network around Droitwich take the export?
- National Grid Electricity Distribution is the distribution network operator for Worcestershire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.