farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Evesham

Farm buildings around Evesham carry broad, shallow roofs that were put up for storage and stock, not for generation. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

876 kWh per kWp a year at this latitude, so a 500 kWp array models at about 438,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Evesham
96 m phase 1
Drawing Evesham unit
Roof 96 x 62 m
Array 500 kWp
Yield 438,000 kWh/yr
Scale 1:500 / Rev A / WR11

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Evesham / Worcestershire
Midlands arable farmland with solar on farm building roofs
Industrial stock of the kind we survey across West Midlands.

Solar for agricultural buildings across Worcestershire

What a farm roof near Evesham generates

Modelled irradiation at this latitude is 1122 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 876 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

The planning record lists 5 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 3.7 MW, with the largest at 30 MW. Source: Renewable Energy Planning Database, Q1 2026.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Evesham is higher than the record shows.

Surveys run across WR postcodes, WR11 outward.

Wychavon is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Evesham roof makes, month by month

What a Evesham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 72 kWh per kWpMarApr: 102 kWh per kWpAprMay: 119 kWh per kWpMayJun: 121 kWh per kWpJunJul: 122 kWh per kWpJul122 kWh Aug: 103 kWh per kWpAugSep: 80 kWh per kWpSepOct: 49 kWh per kWpOctNov: 28 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.1 times what Dec does on the same roof. A 500 kWp array here models at about 438,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3819,000
Mar7236,000
Apr10251,000
May11959,500
Jun12160,500
Jul12261,000
Aug10351,500
Sep8040,000
Oct4924,500
Nov2814,000
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Evesham against the rest of Worcestershire
  • Worcester882
  • Redditch877
  • Droitwich877
  • Evesham876
  • Malvern875
  • Bromsgrove872
  • Kidderminster866

Evesham ranks 4 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

Connections around Evesham are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).

Solar already consented near WR11

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Salford Lodge AR Partners 5 MW Ground Operational
Cleeve Road Kanes Foods 3.7 MW Ground Planning Permission Expired
Sytchwythy Fields AR Partners 1.4 MW Ground Operational
Plant Produce - Solar PV panels Applevale Limited 0.15 MW Ground Operational
Littleton Solar Farm Stark Energy / SSE Renewables 30 MW Ground Operational
Primafruit Limited - Solar Panels Fresca Group Limited n/a Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Evesham

Is there enough sun around Evesham to make this work?
Modelled at 876 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 438,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Evesham?
Only National Grid Electricity Distribution can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in Wychavon?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Wychavon either way.
Has anyone near WR11 already done this?
The planning database records 5 ground mounted and 1 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Worcestershire locations