The case for solar on a Kidderminster holding turns on how much of the output the farm uses itself, not on how much the roof makes. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

866 kWh per kWp a year at this latitude, so a 500 kWp array models at about 433,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Kidderminster
96 m phase 1
Drawing Kidderminster unit
Roof 96 x 62 m
Array 500 kWp
Yield 433,000 kWh/yr
Scale 1:500 / Rev A / DY10

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Kidderminster / Worcestershire
Midlands arable farmland with solar on farm building roofs
Industrial stock of the kind we survey across West Midlands.

Agricultural rooftop solar across Worcestershire

What a farm roof near Kidderminster generates

Modelled irradiation at this latitude is 1111 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 866 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 0.2 MW. Source: Renewable Energy Planning Database, Q1 2026.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Kidderminster is higher than the record shows.

Most of the buildings we look at here sit in the DY postcode area.

Wyre Forest is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Kidderminster roof makes, month by month

What a Kidderminster roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 71 kWh per kWpMarApr: 101 kWh per kWpAprMay: 118 kWh per kWpMayJun: 120 kWh per kWpJunJul: 121 kWh per kWpJul121 kWh Aug: 101 kWh per kWpAugSep: 79 kWh per kWpSepOct: 48 kWh per kWpOctNov: 27 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.0 times what Dec does on the same roof. A 500 kWp array here models at about 433,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3819,000
Mar7135,500
Apr10150,500
May11859,000
Jun12060,000
Jul12160,500
Aug10150,500
Sep7939,500
Oct4824,000
Nov2713,500
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Kidderminster against the rest of Worcestershire
  • Worcester882
  • Redditch877
  • Droitwich877
  • Evesham876
  • Malvern875
  • Bromsgrove872
  • Kidderminster866

Kidderminster ranks 7 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).

Solar already consented near DY10

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Morrisons Superstore - Solar Photovoltaic WM Morrisons Supermarkets Plc 0.45 MW Roof Awaiting Construction
Sion House, Sion Hill - Solar Array Private Developer 0.17 MW Ground Application Submitted
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Kidderminster

What would a 500 kWp array produce on a farm near Kidderminster?
Yes, and the figure matters more than the sunshine. At 866 kWh per kWp a year, a 500 kWp array on a Kidderminster holding models at around 433,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Kidderminster?
Applications go to National Grid Electricity Distribution, who run the network across Worcestershire. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.
What does Wyre Forest require for solar on an agricultural building?
Roof-mounted panels on an agricultural building often fall under permitted development, subject to limits on projection above the roof plane and to the building not being listed or in a conservation area or National Park. We confirm the position with Wyre Forest before the design is finalised.
Has anyone near DY10 already done this?
The planning database records 1 ground mounted and 1 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.