Farm solar panels across Worcestershire
We survey farm and agricultural building roofs throughout Worcestershire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 875 kWh/kWp/yr
- Mean across Worcestershire towns, EU PVGIS v5.2
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Solar on record
- 62 schemes / 506 MW
- REPD Q1 2026, 6 operational
- Towns covered
- 5
- Surveys arranged county wide
What the data says about Worcestershire
Modelled yield is consistent across Worcestershire, from 866 kWh per kWp a year at Kidderminster to 882 at Worcester. At that spread, where the holding sits is not what decides the scheme. Your own demand pattern is.
Across the districts we cover in Worcestershire the planning record lists 6 ground mounted and 13 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.
- Worcester 882 kWh/kWp
- Redditch 877 kWh/kWp
- Kidderminster 866 kWh/kWp
- Bromsgrove 872 kWh/kWp
- Evesham 876 kWh/kWp
- Droitwich 877 kWh/kWp
- Malvern 875 kWh/kWp
Book a survey in Worcestershire
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.