Solar panels for farms in Worcester

A Worcester farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

882 kWh per kWp a year at this latitude, so a 500 kWp array models at about 441,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Worcester
96 m phase 1
Drawing Worcester unit
Roof 96 x 62 m
Array 500 kWp
Yield 441,000 kWh/yr
Scale 1:500 / Rev A / WR4

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Worcester / Worcestershire
Midlands arable farmland with solar on farm building roofs
Industrial stock of the kind we survey across West Midlands.

Farm building solar PV across Worcestershire

What a farm roof near Worcester generates

Modelled irradiation at this latitude is 1132 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 882 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Worcester is higher than the record shows.

We survey holdings across the WR postcode area, starting from WR4.

Worcester is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Worcester roof makes, month by month

What a Worcester roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 73 kWh per kWpMarApr: 102 kWh per kWpAprMay: 120 kWh per kWpMayJun: 121 kWh per kWpJunJul: 123 kWh per kWpJul123 kWh Aug: 103 kWh per kWpAugSep: 81 kWh per kWpSepOct: 49 kWh per kWpOctNov: 28 kWh per kWpNovDec: 20 kWh per kWpDec

Jul produces 6.2 times what Dec does on the same roof. A 500 kWp array here models at about 441,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3919,500
Mar7336,500
Apr10251,000
May12060,000
Jun12160,500
Jul12361,500
Aug10351,500
Sep8140,500
Oct4924,500
Nov2814,000
Dec2010,000
Source: EU PVGIS v5.2
FIG. 2 Worcester against the rest of Worcestershire
  • Worcester882
  • Redditch877
  • Droitwich877
  • Evesham876
  • Malvern875
  • Bromsgrove872
  • Kidderminster866

Worcester ranks 1 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near WR4

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Bosch Thermotecnology UK Limited, Cotswold Way - Solar PV Panels Worcester Bosch 0.93 MW Roof Awaiting Construction
Clayfield Road, Worcester Six Business Park - Solar Panels Logicor 0.42 MW Roof Awaiting Construction
Hornhill Road, Nunnery Way - Solar Panels Indurent Management Limited 0.15 MW Roof Application Submitted

Grid connection through National Grid Electricity Distribution

Connections around Worcester are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Worcester

How much does a farm roof near Worcester generate?
The model gives 882 kWh for every kWp installed here, so 500 kWp comes out at about 441,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Worcester take the export?
National Grid Electricity Distribution is the distribution network operator for Worcestershire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Worcester?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Worcester before design sign-off.
Has anyone near WR4 already done this?
The planning database records 0 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.