Solar panels for farms in Poole
Most holdings around Poole already own the best generating site they will ever have, and it is the roof of the shed they built for something else. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
965 kWh per kWp a year at this latitude, so a 500 kWp array models at about 483,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in PooleIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Dorset
What a farm roof near Poole generates
Modelled irradiation at this latitude is 1232 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 965 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 9 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.
No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.
We survey holdings across the BH postcode area, starting from BH14.
Bournemouth, Christchurch and Poole is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Poole ranks 6 of 8 towns we cover in Dorset on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 924 to 1006, a spread of 82 kWh per kWp. On a 500 kWp array that is about 41,000 kWh a year between the strongest and weakest town in the county.
Grid connection through Scottish and Southern Electricity Networks
Scottish and Southern Electricity Networks operates the distribution network across Dorset, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Across Dorset the planning database records 149 solar schemes totalling 1078 MW, of which 47 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Poole
- How much does a farm roof near Poole generate?
- The model gives 965 kWh for every kWp installed here, so 500 kWp comes out at about 483,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Will the rural network around Poole take the export?
- Scottish and Southern Electricity Networks is the distribution network operator for Dorset. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
- Is planning permission needed for panels on a farm building near Poole?
- Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Bournemouth, Christchurch and Poole before design sign-off.