farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Christchurch

The case for solar on a Christchurch holding turns on how much of the output the farm uses itself, not on how much the roof makes. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

981 kWh per kWp a year at this latitude, so a 500 kWp array models at about 491,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Christchurch
96 m phase 1
Drawing Christchurch unit
Roof 96 x 62 m
Array 500 kWp
Yield 491,000 kWh/yr
Scale 1:500 / Rev A / BH23

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Christchurch / Dorset
South West pasture and farm buildings carrying rooftop solar
Industrial stock of the kind we survey across South West.

Agricultural rooftop solar across Dorset

What a farm roof near Christchurch generates

Modelled irradiation at this latitude is 1247 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 981 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 11 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

The planning record lists 6 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 6.5 MW, with the largest at 36 MW. Source: Renewable Energy Planning Database, Q1 2026.

Most of the buildings we look at here sit in the BH postcode area.

Bournemouth, Christchurch and Poole is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Christchurch roof makes, month by month

What a Christchurch roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 42 kWh per kWpFebMar: 80 kWh per kWpMarApr: 114 kWh per kWpAprMay: 132 kWh per kWpMayJun: 138 kWh per kWpJun138 kWh Jul: 138 kWh per kWpJulAug: 115 kWh per kWpAugSep: 88 kWh per kWpSepOct: 54 kWh per kWpOctNov: 32 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 6.3 times what Dec does on the same roof. A 500 kWp array here models at about 491,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb4221,000
Mar8040,000
Apr11457,000
May13266,000
Jun13869,000
Jul13869,000
Aug11557,500
Sep8844,000
Oct5427,000
Nov3216,000
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Christchurch against the rest of Dorset
  • Weymouth1006
  • Dorchester985
  • Christchurch981
  • Bournemouth971
  • Bridport971
  • Poole965
  • Wimborne964
  • Sherborne924

Christchurch ranks 3 of 8 towns we cover in Dorset on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 924 to 1006, a spread of 82 kWh per kWp. On a 500 kWp array that is about 41,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near BH23

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Parley Renewable Energy Park (PV) Eco Sustainable Solutions 5 MW Ground Application Refused
Beckley Solar Farm Anesco 1.7 MW Ground Operational
Chapel Lane Parley Solar Farm Phase 2 Eco Sustainable Solutions 36 MW Ground Operational
Chapel Lane Parley Solar Farm Phase 3 Eco Sustainable Solutions 4 MW Ground Operational
Christchurch Energy New Forest Energy Ltd 18 MW Ground Operational
Hale Farm Hale Solar Limited 8 MW Ground Operational

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Dorset the planning database records 149 solar schemes totalling 1078 MW, of which 47 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Christchurch

How much does a farm roof near Christchurch generate?
The model gives 981 kWh for every kWp installed here, so 500 kWp comes out at about 491,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Christchurch take the export?
Scottish and Southern Electricity Networks is the distribution network operator for Dorset. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Christchurch?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Bournemouth, Christchurch and Poole before design sign-off.
Has anyone near BH23 already done this?
The planning database records 6 ground mounted and 0 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Dorset locations