Solar panels for farms in Weymouth

Farm buildings around Weymouth carry broad, shallow roofs that were put up for storage and stock, not for generation. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

1006 kWh per kWp a year at this latitude, so a 500 kWp array models at about 503,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Weymouth
96 m phase 1
Drawing Weymouth unit
Roof 96 x 62 m
Array 500 kWp
Yield 503,000 kWh/yr
Scale 1:500 / Rev A / DT3

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Weymouth / Dorset
South West pasture and farm buildings carrying rooftop solar
Industrial stock of the kind we survey across South West.

Farm building solar PV across Dorset

What a farm roof near Weymouth generates

Modelled irradiation at this latitude is 1289 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 1006 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 14 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

The planning record lists 3 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 5 MW. Source: Renewable Energy Planning Database, Q1 2026.

3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Weymouth is higher than the record shows.

We survey holdings across the DT postcode area, starting from DT3.

Dorset is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Weymouth roof makes, month by month

What a Weymouth roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 27 kWh per kWpJanFeb: 43 kWh per kWpFebMar: 81 kWh per kWpMarApr: 117 kWh per kWpAprMay: 136 kWh per kWpMayJun: 139 kWh per kWpJunJul: 142 kWh per kWpJul142 kWh Aug: 119 kWh per kWpAugSep: 91 kWh per kWpSepOct: 54 kWh per kWpOctNov: 33 kWh per kWpNovDec: 23 kWh per kWpDec

Jul produces 6.2 times what Dec does on the same roof. A 500 kWp array here models at about 503,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2713,500
Feb4321,500
Mar8140,500
Apr11758,500
May13668,000
Jun13969,500
Jul14271,000
Aug11959,500
Sep9145,500
Oct5427,000
Nov3316,500
Dec2311,500
Source: EU PVGIS v5.2
FIG. 2 Weymouth against the rest of Dorset
  • Weymouth1006
  • Dorchester985
  • Christchurch981
  • Bournemouth971
  • Bridport971
  • Poole965
  • Wimborne964
  • Sherborne924

Weymouth ranks 1 of 8 towns we cover in Dorset on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 924 to 1006, a spread of 82 kWh per kWp. On a 500 kWp array that is about 41,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near DT3

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
NOTTINGTON LANE SOLAR FARM PS Renewables 5 MW Ground Operational
Land at Newlands Farm British Solar Renewables 5 MW Ground Operational
Chickerell Road, Chickerell - Solar Photovoltaics (PV) Equipment Dorset Council - Assets and Property n/a Roof Operational
Morrisons Supermarket, Dorchester Road - Solar Panels Morrisons 0.38 MW Roof Awaiting Construction
Seaview Holiday Park,Preston Road- Solar Photovoltaics Panels Bourne Leisure Limited 0.2 MW Roof Awaiting Construction
Waterside Holiday Park, Bowleaze Coveway - Solar Arrays Waterside Holiday Group Ltd n/a Ground Application Submitted

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Dorset the planning database records 149 solar schemes totalling 1078 MW, of which 47 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Weymouth

How much does a farm roof near Weymouth generate?
The model gives 1006 kWh for every kWp installed here, so 500 kWp comes out at about 503,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Weymouth take the export?
Scottish and Southern Electricity Networks is the distribution network operator for Dorset. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Weymouth?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Dorset before design sign-off.
Has anyone near DT3 already done this?
The planning database records 3 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Dorset locations