farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Sherborne

A Sherborne farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

924 kWh per kWp a year at this latitude, so a 500 kWp array models at about 462,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Sherborne
96 m phase 1
Drawing Sherborne unit
Roof 96 x 62 m
Array 500 kWp
Yield 462,000 kWh/yr
Scale 1:500 / Rev A / DT9

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Sherborne / Dorset
South West pasture and farm buildings carrying rooftop solar
Industrial stock of the kind we survey across South West.

Farm building solar PV across Dorset

What a farm roof near Sherborne generates

Modelled irradiation at this latitude is 1182 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 924 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 4 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

The planning record lists 5 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 6.7 MW, with the largest at 40 MW. Source: Renewable Energy Planning Database, Q1 2026.

We survey holdings across the DT postcode area, starting from DT9.

Dorset is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Sherborne roof makes, month by month

What a Sherborne roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 41 kWh per kWpFebMar: 76 kWh per kWpMarApr: 108 kWh per kWpAprMay: 125 kWh per kWpMayJun: 126 kWh per kWpJunJul: 127 kWh per kWpJul127 kWh Aug: 108 kWh per kWpAugSep: 84 kWh per kWpSepOct: 50 kWh per kWpOctNov: 31 kWh per kWpNovDec: 22 kWh per kWpDec

Jul produces 5.8 times what Dec does on the same roof. A 500 kWp array here models at about 462,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb4120,500
Mar7638,000
Apr10854,000
May12562,500
Jun12663,000
Jul12763,500
Aug10854,000
Sep8442,000
Oct5025,000
Nov3115,500
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Sherborne against the rest of Dorset
  • Weymouth1006
  • Dorchester985
  • Christchurch981
  • Bournemouth971
  • Bridport971
  • Poole965
  • Wimborne964
  • Sherborne924

Sherborne ranks 8 of 8 towns we cover in Dorset on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 924 to 1006, a spread of 82 kWh per kWp. On a 500 kWp array that is about 41,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near DT9

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Caswell Farm Solar Park Juwi Renewable Energies 6.7 MW Ground Operational
Milborne Port Solar Farm Big 60 Million 4.2 MW Ground Operational
Alton Mead Lane Brilliant Harvest Installations 5 MW Ground Planning Permission Expired
Higher Stockbridge Farm Voltalia UK 35 MW Ground Awaiting Construction
Caswell Farm, Common Lane - Solar Farm GridSource Limited 40 MW Ground Application Submitted

Grid connection through Scottish and Southern Electricity Networks

Connections around Sherborne are handled by Scottish and Southern Electricity Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Dorset the planning database records 149 solar schemes totalling 1078 MW, of which 47 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Sherborne

Is there enough sun around Sherborne to make this work?
Modelled at 924 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 462,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Sherborne?
Only Scottish and Southern Electricity Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in Dorset?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Dorset either way.
Has anyone near DT9 already done this?
The planning database records 5 ground mounted and 0 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Dorset locations