Solar panels for farms in Barrow-in-Furness

Farm buildings around Barrow-in-Furness carry broad, shallow roofs that were put up for storage and stock, not for generation. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

893 kWh per kWp a year at this latitude, so a 500 kWp array models at about 447,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Barrow-in-Furness
96 m phase 1
Drawing Barrow-in-Furness unit
Roof 96 x 62 m
Array 500 kWp
Yield 447,000 kWh/yr
Scale 1:500 / Rev A / LA14

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Barrow-in-Furness / Cumbria
Farmland in the North West with solar arrays on farm building roofs
Industrial stock of the kind we survey across North West.

Agricultural rooftop solar across Cumbria

What a farm roof near Barrow-in-Furness generates

Modelled irradiation at this latitude is 1134 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 893 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

The planning record lists 4 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 3.1 MW, with the largest at 5 MW. Source: Renewable Energy Planning Database, Q1 2026.

2 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Barrow-in-Furness is higher than the record shows.

Most of the buildings we look at here sit in the LA postcode area.

Barrow-in-Furness is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Barrow-in-Furness roof makes, month by month

What a Barrow-in-Furness roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 18 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 72 kWh per kWpMarApr: 108 kWh per kWpAprMay: 133 kWh per kWpMay133 kWh Jun: 130 kWh per kWpJunJul: 129 kWh per kWpJulAug: 108 kWh per kWpAugSep: 77 kWh per kWpSepOct: 44 kWh per kWpOctNov: 23 kWh per kWpNovDec: 15 kWh per kWpDec

May produces 8.9 times what Dec does on the same roof. A 500 kWp array here models at about 447,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan189,000
Feb3718,500
Mar7236,000
Apr10854,000
May13366,500
Jun13065,000
Jul12964,500
Aug10854,000
Sep7738,500
Oct4422,000
Nov2311,500
Dec157,500
Source: EU PVGIS v5.2
FIG. 2 Barrow-in-Furness against the rest of Cumbria
  • Barrow-in-Furness893
  • Whitehaven855
  • Workington835
  • Carlisle806
  • Penrith794
  • Kendal793

Barrow-in-Furness ranks 1 of 6 towns we cover in Cumbria on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 793 to 893, a spread of 100 kWh per kWp. On a 500 kWp array that is about 50,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near LA14

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Sowerby Lodge Farm Gamma Solar Limited 5 MW Ground Operational
Sowerby Lodge Sowerby Solar Solar Ltd 4.2 MW Ground Planning Permission Expired
North Road - Roof Mounted Solar Arrays Barrow Borough Council n/a Roof Awaiting Construction
Sandscale Park - Solar Array Cumbria County Council 2 MW Ground Awaiting Construction
Dova Way, Barrow Island - Solar Array Cumbria County Council 2 MW Ground Awaiting Construction
JJC Waste Management, Sandscale Park - Solar Panels JJC Waste Management 0.73 MW Roof Awaiting Construction

Grid connection through Electricity North West

Electricity North West operates the distribution network across Cumbria, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Cumbria the planning database records 86 solar schemes totalling 574 MW, of which 17 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Barrow-in-Furness

Is there enough sun around Barrow-in-Furness to make this work?
Modelled at 893 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 447,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Barrow-in-Furness?
Only Electricity North West can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in Barrow-in-Furness?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Barrow-in-Furness either way.
Has anyone near LA14 already done this?
The planning database records 4 ground mounted and 2 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.