farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Farm solar panels across Cumbria

We survey farm and agricultural building roofs throughout Cumbria, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.

Modelled yield
829 kWh/kWp/yr
Mean across Cumbria towns, EU PVGIS v5.2
Network operator
Electricity North West
G99 applications and export limits
Solar on record
86 schemes / 574 MW
REPD Q1 2026, 17 operational
Towns covered
6
Surveys arranged county wide

What the data says about Cumbria

Modelled yield is not flat across Cumbria. Barrow-in-Furness comes out at 893 kWh per kWp a year against 793 at Kendal, a spread of 100 kWh per kWp. On a 200 kWp farm array that difference is about 20,000 kWh a year, which is worth checking before accepting a generic saving figure.

Across the districts we cover in Cumbria the planning record lists 16 ground mounted and 11 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.

Connections across the county run through Electricity North West. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.

Towns in Cumbria

Book a survey in Cumbria

Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

All UK locations