Solar panels for farms in Lewes
Most holdings around Lewes already own the best generating site they will ever have, and it is the roof of the shed they built for something else. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
1028 kWh per kWp a year at this latitude, so a 500 kWp array models at about 514,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in LewesIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Sussex
What a farm roof near Lewes generates
Modelled irradiation at this latitude is 1301 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 1028 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 16 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.
No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.
We survey holdings across the BN postcode area, starting from BN7.
Lewes is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Lewes ranks 2 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 500 kWp array that is about 56,500 kWh a year between the strongest and weakest town in the county.
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Lewes
- How much does a farm roof near Lewes generate?
- The model gives 1028 kWh for every kWp installed here, so 500 kWp comes out at about 514,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Is planning permission needed for panels on a farm building near Lewes?
- Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Lewes before design sign-off.