Solar panels for farms in Horsham
Farm buildings around Horsham carry broad, shallow roofs that were put up for storage and stock, not for generation. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
935 kWh per kWp a year at this latitude, so a 500 kWp array models at about 468,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in HorshamIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Sussex
What a farm roof near Horsham generates
Modelled irradiation at this latitude is 1201 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 935 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 6 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.
The planning record lists 2 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 0.5 MW. Source: Renewable Energy Planning Database, Q1 2026.
3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Horsham is higher than the record shows.
We survey holdings across the RH postcode area, starting from RH12.
Horsham is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Horsham ranks 9 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 500 kWp array that is about 56,500 kWh a year between the strongest and weakest town in the county.
Solar already consented near RH12
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| St Peters Hall | Peter Williams Locke King House | 1.7 MW | Roof | Operational |
| Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3 | Schroder Corporate Services Limited | 0.48 MW | Ground | Awaiting Construction |
| Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 2 | Schroder Corporate Services Limited | n/a | Ground | Awaiting Construction |
| Skylark House, St Marks Lane - Solar Panels | Skylark House Care Home Care UK | 0.15 MW | Roof | Awaiting Construction |
| Sainsburys Supermarket, Worthing Road - Solar Panels | Sainsburys Supermarkets Limited | 0.65 MW | Roof | Application Submitted |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Horsham
- Is there enough sun around Horsham to make this work?
- Modelled at 935 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 468,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission in Horsham?
- In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Horsham either way.
- Has anyone near RH12 already done this?
- The planning database records 2 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.