Solar panels for farms in Crawley
A Crawley farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.
915 kWh per kWp a year at this latitude, so a 500 kWp array models at about 458,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in CrawleyIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Agricultural rooftop solar across Sussex
What a farm roof near Crawley generates
Modelled irradiation at this latitude is 1175 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 915 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 3 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.
The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 1.1 MW. Source: Renewable Energy Planning Database, Q1 2026.
5 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Crawley is higher than the record shows.
Most of the buildings we look at here sit in the RH postcode area.
Crawley is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Crawley ranks 10 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 500 kWp array that is about 56,500 kWh a year between the strongest and weakest town in the county.
Solar already consented near RH10
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Majors Hill/Turners Hill Solar Farm | Haymaker Energy | 1.1 MW | Ground | Operational |
| Oriel High School | West Sussex County Council | 0.19 MW | Roof | Operational |
| Manor Royal, Rowfant - Solar PV Array | Vodafone Limited | 0.27 MW | Roof | Application Withdrawn |
| Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array | Hollywood Bowl Group | 0.22 MW | Roof | Awaiting Construction |
| Welland Medical, Hydehurst Lane - Solar Panels | Welland Medical Limited | 0.94 MW | Roof | Awaiting Construction |
| Vodafone UK, Newton Road - Solar Panels | Custom Solar Limited | 0.27 MW | Roof | Awaiting Construction |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Crawley
- Is there enough sun around Crawley to make this work?
- Modelled at 915 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 458,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Do we need planning permission in Crawley?
- In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Crawley either way.
- Has anyone near RH10 already done this?
- The planning database records 1 ground mounted and 5 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.