farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Haywards Heath

Most holdings around Haywards Heath already own the best generating site they will ever have, and it is the roof of the shed they built for something else. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

957 kWh per kWp a year at this latitude, so a 500 kWp array models at about 479,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Haywards Heath
96 m phase 1
Drawing Haywards Heath unit
Roof 96 x 62 m
Array 500 kWp
Yield 479,000 kWh/yr
Scale 1:500 / Rev A / RH16

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Haywards Heath / Sussex
South East farmland with solar arrays on farm buildings
Industrial stock of the kind we survey across South East.

Solar for agricultural buildings across Sussex

What a farm roof near Haywards Heath generates

Modelled irradiation at this latitude is 1230 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 957 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 8 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.

Surveys run across RH postcodes, RH16 outward.

Lewes is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Haywards Heath roof makes, month by month

What a Haywards Heath roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 41 kWh per kWpFebMar: 77 kWh per kWpMarApr: 112 kWh per kWpAprMay: 126 kWh per kWpMayJun: 135 kWh per kWpJun135 kWh Jul: 134 kWh per kWpJulAug: 112 kWh per kWpAugSep: 86 kWh per kWpSepOct: 53 kWh per kWpOctNov: 32 kWh per kWpNovDec: 23 kWh per kWpDec

Jun produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 479,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb4120,500
Mar7738,500
Apr11256,000
May12663,000
Jun13567,500
Jul13467,000
Aug11256,000
Sep8643,000
Oct5326,500
Nov3216,000
Dec2311,500
Source: EU PVGIS v5.2
FIG. 2 Haywards Heath against the rest of Sussex
  • Lewes1028
  • Eastbourne1017
  • Brighton1015
  • Bognor Regis1000
  • Worthing999
  • Hastings989
  • Haywards Heath957
  • Horsham935
  • Crawley915

Haywards Heath ranks 8 of 10 towns we cover in Sussex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 915 to 1028, a spread of 113 kWh per kWp. On a 500 kWp array that is about 56,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Haywards Heath

How much does a farm roof near Haywards Heath generate?
The model gives 957 kWh for every kWp installed here, so 500 kWp comes out at about 479,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Is planning permission needed for panels on a farm building near Haywards Heath?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Lewes before design sign-off.

Nearby

All Sussex locations