farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Doncaster

The case for solar on a Doncaster holding turns on how much of the output the farm uses itself, not on how much the roof makes. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

856 kWh per kWp a year at this latitude, so a 500 kWp array models at about 428,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Doncaster
96 m phase 1
Drawing Doncaster unit
Roof 96 x 62 m
Array 500 kWp
Yield 428,000 kWh/yr
Scale 1:500 / Rev A / DN4

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Doncaster / South Yorkshire
Yorkshire farmland below moorland with rooftop solar on farm buildings
Industrial stock of the kind we survey across Yorkshire and The Humber.

Agricultural rooftop solar across South Yorkshire

What a farm roof near Doncaster generates

Modelled irradiation at this latitude is 1095 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 856 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

2 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Doncaster is higher than the record shows.

Most of the buildings we look at here sit in the DN postcode area.

Doncaster is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Doncaster roof makes, month by month

What a Doncaster roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 21 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 70 kWh per kWpMarApr: 99 kWh per kWpAprMay: 120 kWh per kWpMay120 kWh Jun: 115 kWh per kWpJunJul: 119 kWh per kWpJulAug: 103 kWh per kWpAugSep: 78 kWh per kWpSepOct: 47 kWh per kWpOctNov: 27 kWh per kWpNovDec: 19 kWh per kWpDec

May produces 6.3 times what Dec does on the same roof. A 500 kWp array here models at about 428,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2110,500
Feb3819,000
Mar7035,000
Apr9949,500
May12060,000
Jun11557,500
Jul11959,500
Aug10351,500
Sep7839,000
Oct4723,500
Nov2713,500
Dec199,500
Source: EU PVGIS v5.2
FIG. 2 Doncaster against the rest of South Yorkshire
  • Doncaster856
  • Mexborough847
  • Barnsley839
  • Wombwell838
  • Rotherham835
  • Sheffield830

Doncaster ranks 1 of 6 towns we cover in South Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 830 to 856, a spread of 26 kWh per kWp. Within South Yorkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Northern Powergrid

Connections around Doncaster are handled by Northern Powergrid, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across South Yorkshire the planning database records 93 solar schemes totalling 1624 MW, of which 8 are operational (REPD Q1 2026).

Solar already consented near DN4

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Morris & Co Handlers, Balby Carr Bank - Solar Panels Morris & Co Handlers Limited 0.64 MW Roof Awaiting Construction
Morris And Co Handlers, Balby Carr Bank - Solar Pv Panels Morris & Co Handlers Limited 0.27 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Doncaster

How much does a farm roof near Doncaster generate?
The model gives 856 kWh for every kWp installed here, so 500 kWp comes out at about 428,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Doncaster take the export?
Northern Powergrid is the distribution network operator for South Yorkshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Doncaster?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Doncaster before design sign-off.
Has anyone near DN4 already done this?
The planning database records 0 ground mounted and 2 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby