farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Beverley

A Beverley farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

864 kWh per kWp a year at this latitude, so a 500 kWp array models at about 432,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Beverley
96 m phase 1
Drawing Beverley unit
Roof 96 x 62 m
Array 500 kWp
Yield 432,000 kWh/yr
Scale 1:500 / Rev A / HU17

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Beverley / East Riding of Yorkshire
Yorkshire farmland below moorland with rooftop solar on farm buildings
Industrial stock of the kind we survey across Yorkshire and The Humber.

Solar for agricultural buildings across East Riding of Yorkshire

What a farm roof near Beverley generates

Modelled irradiation at this latitude is 1102 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 864 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

The planning record lists 5 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 40 MW, with the largest at 320 MW. Source: Renewable Energy Planning Database, Q1 2026.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Beverley is higher than the record shows.

Surveys run across HU postcodes, HU17 outward.

East Riding of Yorkshire is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Beverley roof makes, month by month

What a Beverley roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 21 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 71 kWh per kWpMarApr: 101 kWh per kWpAprMay: 122 kWh per kWpMay122 kWh Jun: 117 kWh per kWpJunJul: 120 kWh per kWpJulAug: 104 kWh per kWpAugSep: 78 kWh per kWpSepOct: 48 kWh per kWpOctNov: 27 kWh per kWpNovDec: 18 kWh per kWpDec

May produces 6.8 times what Dec does on the same roof. A 500 kWp array here models at about 432,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2110,500
Feb3718,500
Mar7135,500
Apr10150,500
May12261,000
Jun11758,500
Jul12060,000
Aug10452,000
Sep7839,000
Oct4824,000
Nov2713,500
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Beverley against the rest of East Riding of Yorkshire
  • Driffield870
  • Hessle868
  • Hull867
  • Beverley864
  • Bridlington859
  • Goole858

Beverley ranks 4 of 6 towns we cover in East Riding of Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 858 to 870, a spread of 12 kWh per kWp. Within East Riding of Yorkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near HU17

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Normandy Barracks Ministry of Defence 2.3 MW Ground Under Construction
Field House Solar Farm Albanwise Synergy Limited 40 MW Ground Awaiting Construction
Wingfield Way - Solar Panels WM Morrisons Supermarkets Plc 0.6 MW Roof Awaiting Construction
Carr Lane, Tickton - Solar Farm Albanwise Synergy Limited 49.9 MW Ground Awaiting Construction
Grange Farm, Finchcroft Lane - Solar Panels J Byass and Sons 0.36 MW Ground Awaiting Construction
Peartree Hill Solar Farm JBM Solar / RWE 320 MW Ground Application Submitted

Grid connection through Northern Powergrid

Northern Powergrid operates the distribution network across East Riding of Yorkshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across East Riding of Yorkshire the planning database records 86 solar schemes totalling 1439 MW, of which 2 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Beverley

How much does a farm roof near Beverley generate?
The model gives 864 kWh for every kWp installed here, so 500 kWp comes out at about 432,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Beverley take the export?
Northern Powergrid is the distribution network operator for East Riding of Yorkshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Beverley?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to East Riding of Yorkshire before design sign-off.
Has anyone near HU17 already done this?
The planning database records 5 ground mounted and 1 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All East Riding of Yorkshire locations