Farm solar panels across East Riding of Yorkshire
We survey farm and agricultural building roofs throughout East Riding of Yorkshire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 864 kWh/kWp/yr
- Mean across East Riding of Yorkshire towns, EU PVGIS v5.2
- Network operator
- Northern Powergrid
- G99 applications and export limits
- Solar on record
- 86 schemes / 1439 MW
- REPD Q1 2026, 2 operational
- Towns covered
- 5
- Surveys arranged county wide
What the data says about East Riding of Yorkshire
Modelled yield is consistent across East Riding of Yorkshire, from 858 kWh per kWp a year at Goole to 870 at Driffield. At that spread, where the holding sits is not what decides the scheme. Your own demand pattern is.
Across the districts we cover in East Riding of Yorkshire the planning record lists 15 ground mounted and 6 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through Northern Powergrid. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.
- Bridlington 859 kWh/kWp
- Beverley 864 kWh/kWp
- Goole 858 kWh/kWp
- Hessle 868 kWh/kWp
- Driffield 870 kWh/kWp
- Hull 867 kWh/kWp
Book a survey in East Riding of Yorkshire
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.