farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Goole

Around Goole the constraint is rarely the roof. It is the incoming supply and what the network will accept back. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

858 kWh per kWp a year at this latitude, so a 500 kWp array models at about 429,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Goole
96 m phase 1
Drawing Goole unit
Roof 96 x 62 m
Array 500 kWp
Yield 429,000 kWh/yr
Scale 1:500 / Rev A / DN14

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Goole / East Riding of Yorkshire
Yorkshire farmland below moorland with rooftop solar on farm buildings
Industrial stock of the kind we survey across Yorkshire and The Humber.

Solar for agricultural buildings across East Riding of Yorkshire

What a farm roof near Goole generates

Modelled irradiation at this latitude is 1098 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 858 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

The planning record lists 5 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 5 MW, with the largest at 400 MW. Source: Renewable Energy Planning Database, Q1 2026.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Goole is higher than the record shows.

Surveys run across DN postcodes, DN14 outward.

East Riding of Yorkshire is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Goole roof makes, month by month

What a Goole roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 21 kWh per kWpJanFeb: 36 kWh per kWpFebMar: 70 kWh per kWpMarApr: 100 kWh per kWpAprMay: 122 kWh per kWpMay122 kWh Jun: 116 kWh per kWpJunJul: 120 kWh per kWpJulAug: 104 kWh per kWpAugSep: 78 kWh per kWpSepOct: 47 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

May produces 6.8 times what Dec does on the same roof. A 500 kWp array here models at about 429,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2110,500
Feb3618,000
Mar7035,000
Apr10050,000
May12261,000
Jun11658,000
Jul12060,000
Aug10452,000
Sep7839,000
Oct4723,500
Nov2613,000
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Goole against the rest of East Riding of Yorkshire
  • Driffield870
  • Hessle868
  • Hull867
  • Beverley864
  • Bridlington859
  • Goole858

Goole ranks 6 of 6 towns we cover in East Riding of Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 858 to 870, a spread of 12 kWh per kWp. Within East Riding of Yorkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near DN14

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Pollington Solar Farm Pollington Solar 5 MW Ground Operational
Land at Pollington Airfield Lightsource Renewable Energy 5 MW Ground Operational
Sudforth Lane (Kellingley Solar Farm) First Renewable Developments/ Harworth Group 5 MW Ground Operational
East Yorkshire Solar Farm Boom Power 400 MW Ground Awaiting Construction
Thomas Armstrong - Solar Panels Thomas Armstrong (Construction) Limited 0.18 MW Roof Awaiting Construction
Commons Farm, Thorne Road - Solar Panels C S Backhouse 0.36 MW Ground Awaiting Construction

Grid connection through Northern Powergrid

Northern Powergrid is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across East Riding of Yorkshire the planning database records 86 solar schemes totalling 1439 MW, of which 2 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Goole

What would a 500 kWp array produce on a farm near Goole?
Yes, and the figure matters more than the sunshine. At 858 kWh per kWp a year, a 500 kWp array on a Goole holding models at around 429,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Goole?
Applications go to Northern Powergrid, who run the network across East Riding of Yorkshire. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.
What does East Riding of Yorkshire require for solar on an agricultural building?
Roof-mounted panels on an agricultural building often fall under permitted development, subject to limits on projection above the roof plane and to the building not being listed or in a conservation area or National Park. We confirm the position with East Riding of Yorkshire before the design is finalised.
Has anyone near DN14 already done this?
The planning database records 5 ground mounted and 1 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All East Riding of Yorkshire locations