farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Manchester

Farm buildings around Manchester carry broad, shallow roofs that were put up for storage and stock, not for generation. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

788 kWh per kWp a year at this latitude, so a 500 kWp array models at about 394,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Manchester
96 m phase 1
Drawing Manchester unit
Roof 96 x 62 m
Array 500 kWp
Yield 394,000 kWh/yr
Scale 1:500 / Rev A / M12

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Manchester / Greater Manchester
Farmland in the North West with solar arrays on farm building roofs
Industrial stock of the kind we survey across North West.

Agricultural rooftop solar across Greater Manchester

What a farm roof near Manchester generates

Modelled irradiation at this latitude is 1010 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 788 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 11 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

2 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Manchester is higher than the record shows.

Most of the buildings we look at here sit in the M postcode area.

Manchester is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Manchester roof makes, month by month

What a Manchester roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 17 kWh per kWpJanFeb: 33 kWh per kWpFebMar: 66 kWh per kWpMarApr: 95 kWh per kWpAprMay: 112 kWh per kWpMay112 kWh Jun: 110 kWh per kWpJunJul: 108 kWh per kWpJulAug: 92 kWh per kWpAugSep: 71 kWh per kWpSepOct: 43 kWh per kWpOctNov: 25 kWh per kWpNovDec: 16 kWh per kWpDec

May produces 7.0 times what Dec does on the same roof. A 500 kWp array here models at about 394,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan178,500
Feb3316,500
Mar6633,000
Apr9547,500
May11256,000
Jun11055,000
Jul10854,000
Aug9246,000
Sep7135,500
Oct4321,500
Nov2512,500
Dec168,000
Source: EU PVGIS v5.2
FIG. 2 Manchester against the rest of Greater Manchester
  • Wigan828
  • Altrincham816
  • Bolton801
  • Salford794
  • Manchester788
  • Bury788
  • Stockport785
  • Rochdale771
  • Oldham771

Manchester ranks 5 of 10 towns we cover in Greater Manchester on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 769 to 828, a spread of 59 kWh per kWp. On a 500 kWp array that is about 29,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near M12

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Outer Space Studios Solar Panels Ameresco Limited 0.6 MW Roof Operational
Co Op Academy Belle Vue, Hyde Road - Solar Panels Co-op Academy Trust 0.16 MW Roof Application Submitted

Grid connection through Electricity North West

Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Greater Manchester the planning database records 118 solar schemes totalling 110 MW, of which 11 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Manchester

How much does a farm roof near Manchester generate?
The model gives 788 kWh for every kWp installed here, so 500 kWp comes out at about 394,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Manchester take the export?
Electricity North West is the distribution network operator for Greater Manchester. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Manchester?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Manchester before design sign-off.
Has anyone near M12 already done this?
The planning database records 0 ground mounted and 2 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Greater Manchester locations