Solar panels for farms in Bury

Most holdings around Bury already own the best generating site they will ever have, and it is the roof of the shed they built for something else. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

788 kWh per kWp a year at this latitude, so a 500 kWp array models at about 394,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Bury
96 m phase 1
Drawing Bury unit
Roof 96 x 62 m
Array 500 kWp
Yield 394,000 kWh/yr
Scale 1:500 / Rev A / BL9

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Bury / Greater Manchester
Farmland in the North West with solar arrays on farm building roofs
Industrial stock of the kind we survey across North West.

Farm building solar PV across Greater Manchester

What a farm roof near Bury generates

Modelled irradiation at this latitude is 1009 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 788 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 11 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Bury is higher than the record shows.

We survey holdings across the BL postcode area, starting from BL9.

Bury is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Bury roof makes, month by month

What a Bury roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 17 kWh per kWpJanFeb: 33 kWh per kWpFebMar: 65 kWh per kWpMarApr: 95 kWh per kWpAprMay: 113 kWh per kWpMay113 kWh Jun: 110 kWh per kWpJunJul: 109 kWh per kWpJulAug: 92 kWh per kWpAugSep: 70 kWh per kWpSepOct: 43 kWh per kWpOctNov: 24 kWh per kWpNovDec: 16 kWh per kWpDec

May produces 7.1 times what Dec does on the same roof. A 500 kWp array here models at about 394,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan178,500
Feb3316,500
Mar6532,500
Apr9547,500
May11356,500
Jun11055,000
Jul10954,500
Aug9246,000
Sep7035,000
Oct4321,500
Nov2412,000
Dec168,000
Source: EU PVGIS v5.2
FIG. 2 Bury against the rest of Greater Manchester
  • Altrincham816
  • Bolton801
  • Salford794
  • Manchester788
  • Bury788
  • Stockport785
  • Rochdale771
  • Oldham771
  • Ashton-under-Lyne769

Bury ranks 6 of 10 towns we cover in Greater Manchester on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 769 to 828, a spread of 59 kWh per kWp. On a 500 kWp array that is about 29,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near BL9

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
The Food Warehouse Iceland, Pilsworth Road -Solar Panels Ashcroft Electrical Services Limited 0.16 MW Roof Awaiting Construction

Grid connection through Electricity North West

Connections around Bury are handled by Electricity North West, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Greater Manchester the planning database records 118 solar schemes totalling 110 MW, of which 11 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Bury

How much does a farm roof near Bury generate?
The model gives 788 kWh for every kWp installed here, so 500 kWp comes out at about 394,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Bury take the export?
Electricity North West is the distribution network operator for Greater Manchester. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Bury?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Bury before design sign-off.