farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Torquay

Around Torquay the constraint is rarely the roof. It is the incoming supply and what the network will accept back. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

937 kWh per kWp a year at this latitude, so a 500 kWp array models at about 469,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Torquay
96 m phase 1
Drawing Torquay unit
Roof 96 x 62 m
Array 500 kWp
Yield 469,000 kWh/yr
Scale 1:500 / Rev A / TQ2

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Torquay / Devon
South West pasture and farm buildings carrying rooftop solar
Industrial stock of the kind we survey across South West.

Farm building solar PV across Devon

What a farm roof near Torquay generates

Modelled irradiation at this latitude is 1191 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 937 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 6 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 3.2 MW. Source: Renewable Energy Planning Database, Q1 2026.

We survey holdings across the TQ postcode area, starting from TQ2.

Torbay is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Torquay roof makes, month by month

What a Torquay roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 75 kWh per kWpMarApr: 109 kWh per kWpAprMay: 128 kWh per kWpMayJun: 131 kWh per kWpJun131 kWh Jul: 130 kWh per kWpJulAug: 110 kWh per kWpAugSep: 85 kWh per kWpSepOct: 52 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jun produces 6.2 times what Dec does on the same roof. A 500 kWp array here models at about 469,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3919,500
Mar7537,500
Apr10954,500
May12864,000
Jun13165,500
Jul13065,000
Aug11055,000
Sep8542,500
Oct5226,000
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Torquay against the rest of Devon
  • Paignton961
  • Plymouth960
  • Newton Abbot943
  • Exeter938
  • Torquay937
  • Exmouth937
  • Barnstaple908
  • Tiverton903

Torquay ranks 5 of 8 towns we cover in Devon on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 961, a spread of 58 kWh per kWp. On a 500 kWp array that is about 29,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Devon, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Devon the planning database records 248 solar schemes totalling 1451 MW, of which 90 are operational (REPD Q1 2026).

Solar already consented near TQ2

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Torbay Hospital, Nightingale Park - Solar Panel Array TDA 3.2 MW Ground Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Torquay

What would a 500 kWp array produce on a farm near Torquay?
Yes, and the figure matters more than the sunshine. At 937 kWh per kWp a year, a 500 kWp array on a Torquay holding models at around 469,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Torquay?
Applications go to National Grid Electricity Distribution, who run the network across Devon. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.
What does Torbay require for solar on an agricultural building?
Roof-mounted panels on an agricultural building often fall under permitted development, subject to limits on projection above the roof plane and to the building not being listed or in a conservation area or National Park. We confirm the position with Torbay before the design is finalised.

Nearby

All Devon locations