farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Newton Abbot

A Newton Abbot farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

943 kWh per kWp a year at this latitude, so a 500 kWp array models at about 472,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Newton Abbot
96 m phase 1
Drawing Newton Abbot unit
Roof 96 x 62 m
Array 500 kWp
Yield 472,000 kWh/yr
Scale 1:500 / Rev A / TQ12

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Newton Abbot / Devon
South West pasture and farm buildings carrying rooftop solar
Industrial stock of the kind we survey across South West.

Agricultural rooftop solar across Devon

What a farm roof near Newton Abbot generates

Modelled irradiation at this latitude is 1200 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 943 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 6 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

The planning record lists 2 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 16.5 MW, with the largest at 21 MW. Source: Renewable Energy Planning Database, Q1 2026.

3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Newton Abbot is higher than the record shows.

Most of the buildings we look at here sit in the TQ postcode area.

Teignbridge is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Newton Abbot roof makes, month by month

What a Newton Abbot roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 41 kWh per kWpFebMar: 77 kWh per kWpMarApr: 111 kWh per kWpAprMay: 129 kWh per kWpMayJun: 130 kWh per kWpJun130 kWh Jul: 130 kWh per kWpJulAug: 111 kWh per kWpAugSep: 86 kWh per kWpSepOct: 53 kWh per kWpOctNov: 31 kWh per kWpNovDec: 18 kWh per kWpDec

Jun produces 7.2 times what Dec does on the same roof. A 500 kWp array here models at about 472,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb4120,500
Mar7738,500
Apr11155,500
May12964,500
Jun13065,000
Jul13065,000
Aug11155,500
Sep8643,000
Oct5326,500
Nov3115,500
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Newton Abbot against the rest of Devon
  • Paignton961
  • Plymouth960
  • Newton Abbot943
  • Exeter938
  • Torquay937
  • Exmouth937
  • Barnstaple908
  • Tiverton903

Newton Abbot ranks 3 of 8 towns we cover in Devon on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 961, a spread of 58 kWh per kWp. On a 500 kWp array that is about 29,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near TQ12

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Rydon Farm MTS Rydon Solar 12 MW Ground Operational
Court Barton Farm, Coffinswell - Solar Farm Coubar Energy Limited (Windel) 21 MW Ground Awaiting Construction
Brooke House, Sabre Close - Solar Panels Wilton Bradley Limited 0.28 MW Roof Awaiting Construction
East Golds Works, Kingsteignton Road - Solar Panels Sibelco UK East Golds Works 1.06 MW Roof Awaiting Construction
Sibelco UK Preston Manor Works, Kingsteignton - Solar Panels Sibelco UK Preston Manor Works 0.79 MW Roof Awaiting Construction

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Devon, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Devon the planning database records 248 solar schemes totalling 1451 MW, of which 90 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Newton Abbot

What would a 500 kWp array produce on a farm near Newton Abbot?
Yes, and the figure matters more than the sunshine. At 943 kWh per kWp a year, a 500 kWp array on a Newton Abbot holding models at around 472,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Newton Abbot?
Applications go to National Grid Electricity Distribution, who run the network across Devon. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.
What does Teignbridge require for solar on an agricultural building?
Roof-mounted panels on an agricultural building often fall under permitted development, subject to limits on projection above the roof plane and to the building not being listed or in a conservation area or National Park. We confirm the position with Teignbridge before the design is finalised.
Has anyone near TQ12 already done this?
The planning database records 2 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Devon locations