A Bude farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

929 kWh per kWp a year at this latitude, so a 500 kWp array models at about 465,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Bude
96 m phase 1
Drawing Bude unit
Roof 96 x 62 m
Array 500 kWp
Yield 465,000 kWh/yr
Scale 1:500 / Rev A / Cornwall

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Bude / Cornwall
A modern steel framed agricultural building with its roof covered in solar panels, tractor and trailer in the yard, fields beyond
Industrial stock of the kind we survey across Cornwall.

Agricultural rooftop solar across Cornwall

What a farm roof near Bude generates

Modelled irradiation at this latitude is 1173 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 929 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 5 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.

FIG. 1 What a Bude roof makes, month by month

What a Bude roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 42 kWh per kWpFebMar: 77 kWh per kWpMarApr: 112 kWh per kWpAprMay: 128 kWh per kWpMay128 kWh Jun: 127 kWh per kWpJunJul: 125 kWh per kWpJulAug: 107 kWh per kWpAugSep: 84 kWh per kWpSepOct: 52 kWh per kWpOctNov: 29 kWh per kWpNovDec: 21 kWh per kWpDec

May produces 6.1 times what Dec does on the same roof. A 500 kWp array here models at about 465,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb4221,000
Mar7738,500
Apr11256,000
May12864,000
Jun12763,500
Jul12562,500
Aug10753,500
Sep8442,000
Oct5226,000
Nov2914,500
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Bude against the rest of Cornwall
  • Penzance979
  • Falmouth943
  • Newquay940
  • Truro940
  • St Austell936
  • Bodmin929
  • Bude929
  • Camborne921

Bude ranks 7 of 8 towns we cover in Cornwall on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 921 to 979, a spread of 58 kWh per kWp. On a 500 kWp array that is about 29,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

Connections around Bude are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Cornwall the planning database records 174 solar schemes totalling 1116 MW, of which 88 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Bude

How much does a farm roof near Bude generate?
The model gives 929 kWh for every kWp installed here, so 500 kWp comes out at about 465,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Bude take the export?
National Grid Electricity Distribution is the distribution network operator for Cornwall. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.