farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Newquay

Around Newquay the constraint is rarely the roof. It is the incoming supply and what the network will accept back. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

940 kWh per kWp a year at this latitude, so a 500 kWp array models at about 470,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Newquay
96 m phase 1
Drawing Newquay unit
Roof 96 x 62 m
Array 500 kWp
Yield 470,000 kWh/yr
Scale 1:500 / Rev A / TR7

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Newquay / Cornwall
South West pasture and farm buildings carrying rooftop solar
Industrial stock of the kind we survey across South West.

Agricultural rooftop solar across Cornwall

What a farm roof near Newquay generates

Modelled irradiation at this latitude is 1194 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 940 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 6 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 0.2 MW. Source: Renewable Energy Planning Database, Q1 2026.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Newquay is higher than the record shows.

Most of the buildings we look at here sit in the TR postcode area.

Cornwall is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Newquay roof makes, month by month

What a Newquay roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 43 kWh per kWpFebMar: 77 kWh per kWpMarApr: 112 kWh per kWpAprMay: 127 kWh per kWpMayJun: 128 kWh per kWpJun128 kWh Jul: 125 kWh per kWpJulAug: 111 kWh per kWpAugSep: 86 kWh per kWpSepOct: 53 kWh per kWpOctNov: 31 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 5.8 times what Dec does on the same roof. A 500 kWp array here models at about 470,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb4321,500
Mar7738,500
Apr11256,000
May12763,500
Jun12864,000
Jul12562,500
Aug11155,500
Sep8643,000
Oct5326,500
Nov3115,500
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Newquay against the rest of Cornwall
  • Penzance979
  • Falmouth943
  • Newquay940
  • Truro940
  • St Austell936
  • Bodmin929
  • Bude929
  • Camborne921

Newquay ranks 3 of 8 towns we cover in Cornwall on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 921 to 979, a spread of 58 kWh per kWp. On a 500 kWp array that is about 29,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near TR7

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Treloggan Road - Solar Panels WM Morrisons Supermarkets Plc 0.37 MW Roof Awaiting Construction
Headland Hotel, Headland Road - Solar Panels The Headland Hotel 0.18 MW Ground Application Refused

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Cornwall, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Cornwall the planning database records 174 solar schemes totalling 1116 MW, of which 88 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Newquay

How much does a farm roof near Newquay generate?
The model gives 940 kWh for every kWp installed here, so 500 kWp comes out at about 470,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Newquay take the export?
National Grid Electricity Distribution is the distribution network operator for Cornwall. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Newquay?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Cornwall before design sign-off.
Has anyone near TR7 already done this?
The planning database records 1 ground mounted and 1 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Cornwall locations