Around Leeds the constraint is rarely the roof. It is the incoming supply and what the network will accept back. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.
830 kWh per kWp a year at this latitude, so a 500 kWp array models at about 415,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in LeedsIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Solar for agricultural buildings across West Yorkshire
What a farm roof near Leeds generates
Modelled irradiation at this latitude is 1060 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 830 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 6 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.
3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Leeds is higher than the record shows.
Surveys run across LS postcodes, LS2 outward.
Leeds is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Leeds ranks 4 of 8 towns we cover in West Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 811 to 846, a spread of 35 kWh per kWp. Within West Yorkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through Northern Powergrid
Northern Powergrid is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Across West Yorkshire the planning database records 170 solar schemes totalling 550 MW, of which 8 are operational (REPD Q1 2026).
Solar already consented near LS2
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Regent Street, Sheepscar - Solar Panels | Stokers Limited | 0.22 MW | Roof | Operational |
| Victoria Gate Leeds, George Street - Solar Panels | Redical Holdings | 0.17 MW | Roof | Awaiting Construction |
| Leeds Dental Institute, The Worsley Medical - Solar Panels | University of Leeds | n/a | Roof | Application Submitted |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Leeds
- Is there enough sun around Leeds to make this work?
- Modelled at 830 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 415,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export near Leeds?
- Only Northern Powergrid can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
- Do we need planning permission in Leeds?
- In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Leeds either way.
- Has anyone near LS2 already done this?
- The planning database records 0 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.