Solar panels for farms in Thame
Most holdings around Thame already own the best generating site they will ever have, and it is the roof of the shed they built for something else. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
891 kWh per kWp a year at this latitude, so a 500 kWp array models at about 446,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in ThameIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Oxfordshire
What a farm roof near Thame generates
Modelled irradiation at this latitude is 1142 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 891 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.
The planning record lists 6 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 49.9 MW. Source: Renewable Energy Planning Database, Q1 2026.
We survey holdings across the OX postcode area, starting from OX9.
South Oxfordshire is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Thame ranks 8 of 8 towns we cover in Oxfordshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 891 to 913, a spread of 22 kWh per kWp. Within Oxfordshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through Scottish and Southern Electricity Networks
Scottish and Southern Electricity Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Across Oxfordshire the planning database records 149 solar schemes totalling 2544 MW, of which 31 are operational (REPD Q1 2026).
Solar already consented near OX9
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Thame solar farm | Big 60 Million | 4.3 MW | Ground | Operational |
| The Oxfordshire Golf Club | The Oxfordshire Golf Club | 0.3 MW | Ground | Operational |
| Cornwell Solar Farm | Low Carbon / EDF Energy Renewables | 49.9 MW | Ground | Awaiting Construction |
| Harlesford Solar Farm | Harlesford Solar Farm Limited | 49.9 MW | Ground | Awaiting Construction |
| Dodwells Solar Farm | Opdenergy UK Limited | 49.9 MW | Ground | Awaiting Construction |
| Postcombe - Solar Array | Solar 2 Limited | 49.9 MW | Ground | Application Submitted |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Thame
- Is there enough sun around Thame to make this work?
- Modelled at 891 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 446,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export near Thame?
- Only Scottish and Southern Electricity Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
- Do we need planning permission in South Oxfordshire?
- In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with South Oxfordshire either way.
- Has anyone near OX9 already done this?
- The planning database records 6 ground mounted and 0 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.