farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Ripon

Farm buildings around Ripon carry broad, shallow roofs that were put up for storage and stock, not for generation. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

834 kWh per kWp a year at this latitude, so a 500 kWp array models at about 417,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Ripon
96 m phase 1
Drawing Ripon unit
Roof 96 x 62 m
Array 500 kWp
Yield 417,000 kWh/yr
Scale 1:500 / Rev A / HG4

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Ripon / North Yorkshire
Yorkshire farmland below moorland with rooftop solar on farm buildings
Industrial stock of the kind we survey across Yorkshire and The Humber.

Solar for agricultural buildings across North Yorkshire

What a farm roof near Ripon generates

Modelled irradiation at this latitude is 1064 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 834 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 6 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

The planning record lists 2 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 2.6 MW, with the largest at 5 MW. Source: Renewable Energy Planning Database, Q1 2026.

4 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Ripon is higher than the record shows.

Surveys run across HG postcodes, HG4 outward.

Harrogate is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Ripon roof makes, month by month

What a Ripon roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 34 kWh per kWpFebMar: 68 kWh per kWpMarApr: 99 kWh per kWpAprMay: 119 kWh per kWpMay119 kWh Jun: 113 kWh per kWpJunJul: 118 kWh per kWpJulAug: 101 kWh per kWpAugSep: 75 kWh per kWpSepOct: 44 kWh per kWpOctNov: 25 kWh per kWpNovDec: 17 kWh per kWpDec

May produces 7.0 times what Dec does on the same roof. A 500 kWp array here models at about 417,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3417,000
Mar6834,000
Apr9949,500
May11959,500
Jun11356,500
Jul11859,000
Aug10150,500
Sep7537,500
Oct4422,000
Nov2512,500
Dec178,500
Source: EU PVGIS v5.2
FIG. 2 Ripon against the rest of North Yorkshire
  • Scarborough859
  • Whitby849
  • York840
  • Ripon834
  • Knaresborough833
  • Harrogate831
  • Northallerton817
  • Skipton799

Ripon ranks 4 of 8 towns we cover in North Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 799 to 859, a spread of 60 kWh per kWp. On a 500 kWp array that is about 30,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near HG4

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Barugh Farm HB & CH Barker Ltd 5 MW Ground Operational
Duffield Wood Yard, Melmerby Green Lane - Solar Panels Duffield Timber 0.2 MW Roof Awaiting Construction
Newby Hall Estate, The Stables - Solar Panels Newby Hall Estate 0.15 MW Roof Awaiting Construction
Sawley Hall, Sawley - Solar Pv Array Sawley Estate 0.23 MW Ground Application Withdrawn
Cedar Retreats, West Tanfield - Solar Panels Cedar Retreats 0.17 MW Roof Awaiting Construction
Ripon Grammar School, Clotherholme Road - Solar Panels Solar Options for Schools Limited 0.44 MW Roof Awaiting Construction

Grid connection through Northern Powergrid

Connections around Ripon are handled by Northern Powergrid, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across North Yorkshire the planning database records 151 solar schemes totalling 1723 MW, of which 18 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Ripon

Is there enough sun around Ripon to make this work?
Modelled at 834 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 417,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Ripon?
Only Northern Powergrid can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in Harrogate?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Harrogate either way.
Has anyone near HG4 already done this?
The planning database records 2 ground mounted and 4 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.