A Market Harborough farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

891 kWh per kWp a year at this latitude, so a 500 kWp array models at about 446,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Market Harborough
96 m phase 1
Drawing Market Harborough unit
Roof 96 x 62 m
Array 500 kWp
Yield 446,000 kWh/yr
Scale 1:500 / Rev A / LE16

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Market Harborough / Leicestershire
Midlands arable farmland with solar on farm building roofs
Industrial stock of the kind we survey across East Midlands.

Agricultural rooftop solar across Leicestershire

What a farm roof near Market Harborough generates

Modelled irradiation at this latitude is 1136 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 891 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

The planning record lists 3 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 5 MW, with the largest at 49.9 MW. Source: Renewable Energy Planning Database, Q1 2026.

3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Market Harborough is higher than the record shows.

Most of the buildings we look at here sit in the LE postcode area.

Harborough is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Market Harborough roof makes, month by month

What a Market Harborough roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 73 kWh per kWpMarApr: 103 kWh per kWpAprMay: 120 kWh per kWpMayJun: 122 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 106 kWh per kWpAugSep: 82 kWh per kWpSepOct: 50 kWh per kWpOctNov: 29 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 446,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3718,500
Mar7336,500
Apr10351,500
May12060,000
Jun12261,000
Jul12462,000
Aug10653,000
Sep8241,000
Oct5025,000
Nov2914,500
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Market Harborough against the rest of Leicestershire
  • Market Harborough891
  • Melton Mowbray879
  • Wigston877
  • Leicester874
  • Hinckley870
  • Loughborough868
  • Coalville863

Market Harborough ranks 1 of 7 towns we cover in Leicestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 863 to 891, a spread of 28 kWh per kWp. Within Leicestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near LE16

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Eckland Lodge Farm Stuart Howes & Son Ltd 2.9 MW Ground Operational
RAF Desborough RAF Desb 49.9 MW Ground Planning Permission Expired
Land at Meadow Farm Lightsource Renewable Energy 5 MW Ground Operational
The Robert Smyth School, Burnmill Road - Solar Panels Robert Smyth Academy 0.17 MW Roof Revised
The Robert Smyth School, Burnmill Road - Solar Panels Robert Smyth Academy 0.17 MW Roof Awaiting Construction
Astley Grange Farm, Back Lane - Solar Panels Unknown 0.28 MW Roof Awaiting Construction

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Leicestershire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Leicestershire the planning database records 165 solar schemes totalling 1259 MW, of which 37 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Market Harborough

What would a 500 kWp array produce on a farm near Market Harborough?
Yes, and the figure matters more than the sunshine. At 891 kWh per kWp a year, a 500 kWp array on a Market Harborough holding models at around 446,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Market Harborough?
Applications go to National Grid Electricity Distribution, who run the network across Leicestershire. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.
What does Harborough require for solar on an agricultural building?
Roof-mounted panels on an agricultural building often fall under permitted development, subject to limits on projection above the roof plane and to the building not being listed or in a conservation area or National Park. We confirm the position with Harborough before the design is finalised.
Has anyone near LE16 already done this?
The planning database records 3 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.