Solar panels for farms in Fareham

Around Fareham the constraint is rarely the roof. It is the incoming supply and what the network will accept back. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

980 kWh per kWp a year at this latitude, so a 500 kWp array models at about 490,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Fareham
96 m phase 1
Drawing Fareham unit
Roof 96 x 62 m
Array 500 kWp
Yield 490,000 kWh/yr
Scale 1:500 / Rev A / PO14

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Fareham / Hampshire
South East farmland with solar arrays on farm buildings
Industrial stock of the kind we survey across South East.

Agricultural rooftop solar across Hampshire

What a farm roof near Fareham generates

Modelled irradiation at this latitude is 1262 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 980 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 11 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 20.5 MW. Source: Renewable Energy Planning Database, Q1 2026.

Most of the buildings we look at here sit in the PO postcode area.

Fareham is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Fareham roof makes, month by month

What a Fareham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 27 kWh per kWpJanFeb: 43 kWh per kWpFebMar: 80 kWh per kWpMarApr: 114 kWh per kWpAprMay: 130 kWh per kWpMayJun: 137 kWh per kWpJun137 kWh Jul: 136 kWh per kWpJulAug: 114 kWh per kWpAugSep: 88 kWh per kWpSepOct: 55 kWh per kWpOctNov: 33 kWh per kWpNovDec: 24 kWh per kWpDec

Jun produces 5.7 times what Dec does on the same roof. A 500 kWp array here models at about 490,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2713,500
Feb4321,500
Mar8040,000
Apr11457,000
May13065,000
Jun13768,500
Jul13668,000
Aug11457,000
Sep8844,000
Oct5527,500
Nov3316,500
Dec2412,000
Source: EU PVGIS v5.2
FIG. 2 Fareham against the rest of Hampshire
  • Portsmouth987
  • Fareham980
  • Southampton950
  • Eastleigh942
  • Winchester917
  • Andover915
  • Basingstoke906
  • Fleet904
  • Farnborough903

Fareham ranks 2 of 10 towns we cover in Hampshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 987, a spread of 84 kWh per kWp. On a 500 kWp array that is about 42,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near PO14

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Newlands Farm Solar Sunsave 10 (FAREHAM) / Vogt Solar 20.5 MW Ground Operational

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks operates the distribution network across Hampshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Hampshire the planning database records 237 solar schemes totalling 1634 MW, of which 51 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Fareham

Is there enough sun around Fareham to make this work?
Modelled at 980 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 490,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Fareham?
Only Scottish and Southern Electricity Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in Fareham?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Fareham either way.