Solar panels for farms in Winchester

A Winchester farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

917 kWh per kWp a year at this latitude, so a 500 kWp array models at about 459,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Winchester
96 m phase 1
Drawing Winchester unit
Roof 96 x 62 m
Array 500 kWp
Yield 459,000 kWh/yr
Scale 1:500 / Rev A / SO23

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Winchester / Hampshire
South East farmland with solar arrays on farm buildings
Industrial stock of the kind we survey across South East.

Agricultural rooftop solar across Hampshire

What a farm roof near Winchester generates

Modelled irradiation at this latitude is 1180 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 917 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 3 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Winchester is higher than the record shows.

Most of the buildings we look at here sit in the SO postcode area.

Winchester is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Winchester roof makes, month by month

What a Winchester roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 40 kWh per kWpFebMar: 76 kWh per kWpMarApr: 107 kWh per kWpAprMay: 122 kWh per kWpMayJun: 126 kWh per kWpJun126 kWh Jul: 126 kWh per kWpJulAug: 106 kWh per kWpAugSep: 83 kWh per kWpSepOct: 52 kWh per kWpOctNov: 31 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 5.7 times what Dec does on the same roof. A 500 kWp array here models at about 459,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb4020,000
Mar7638,000
Apr10753,500
May12261,000
Jun12663,000
Jul12663,000
Aug10653,000
Sep8341,500
Oct5226,000
Nov3115,500
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Winchester against the rest of Hampshire
  • Portsmouth987
  • Fareham980
  • Southampton950
  • Eastleigh942
  • Winchester917
  • Andover915
  • Basingstoke906
  • Fleet904
  • Farnborough903

Winchester ranks 5 of 10 towns we cover in Hampshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 987, a spread of 84 kWh per kWp. On a 500 kWp array that is about 42,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near SO23

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Micheldever Tyres Winchester, Winnall Warehouse - Solar PV Panels Micheldever Tyres Winchester n/a Roof Awaiting Construction

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Hampshire the planning database records 237 solar schemes totalling 1634 MW, of which 51 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Winchester

What would a 500 kWp array produce on a farm near Winchester?
Yes, and the figure matters more than the sunshine. At 917 kWh per kWp a year, a 500 kWp array on a Winchester holding models at around 459,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Winchester?
Applications go to Scottish and Southern Electricity Networks, who run the network across Hampshire. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.
What does Winchester require for solar on an agricultural building?
Roof-mounted panels on an agricultural building often fall under permitted development, subject to limits on projection above the roof plane and to the building not being listed or in a conservation area or National Park. We confirm the position with Winchester before the design is finalised.