Solar panels for farms in Aldershot

A Aldershot farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

903 kWh per kWp a year at this latitude, so a 500 kWp array models at about 452,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Aldershot
96 m phase 1
Drawing Aldershot unit
Roof 96 x 62 m
Array 500 kWp
Yield 452,000 kWh/yr
Scale 1:500 / Rev A / GU11

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Aldershot / Hampshire
South East farmland with solar arrays on farm buildings
Industrial stock of the kind we survey across South East.

Farm building solar PV across Hampshire

What a farm roof near Aldershot generates

Modelled irradiation at this latitude is 1158 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 903 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.

We survey holdings across the GU postcode area, starting from GU11.

Rushmoor is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Aldershot roof makes, month by month

What a Aldershot roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 105 kWh per kWpAprMay: 120 kWh per kWpMayJun: 125 kWh per kWpJunJul: 126 kWh per kWpJul126 kWh Aug: 106 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 22 kWh per kWpDec

Jul produces 5.7 times what Dec does on the same roof. A 500 kWp array here models at about 452,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3819,000
Mar7336,500
Apr10552,500
May12060,000
Jun12562,500
Jul12663,000
Aug10653,000
Sep8341,500
Oct5125,500
Nov3015,000
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Aldershot against the rest of Hampshire
  • Fareham980
  • Southampton950
  • Eastleigh942
  • Winchester917
  • Andover915
  • Basingstoke906
  • Fleet904
  • Farnborough903
  • Aldershot903

Aldershot ranks 10 of 10 towns we cover in Hampshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 903 to 987, a spread of 84 kWh per kWp. On a 500 kWp array that is about 42,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Scottish and Southern Electricity Networks

Connections around Aldershot are handled by Scottish and Southern Electricity Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Hampshire the planning database records 237 solar schemes totalling 1634 MW, of which 51 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Aldershot

Is there enough sun around Aldershot to make this work?
Modelled at 903 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 452,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Aldershot?
Only Scottish and Southern Electricity Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in Rushmoor?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Rushmoor either way.