farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Marylebone

A Marylebone farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

902 kWh per kWp a year at this latitude, so a 500 kWp array models at about 451,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Marylebone
96 m phase 1
Drawing Marylebone unit
Roof 96 x 62 m
Array 500 kWp
Yield 451,000 kWh/yr
Scale 1:500 / Rev A / Greater London

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Marylebone / Greater London
A modern steel framed agricultural building with its roof covered in solar panels, tractor and trailer in the yard, fields beyond
Industrial stock of the kind we survey across Greater London.

Farm building solar PV across Greater London

What a farm roof near Marylebone generates

Modelled irradiation at this latitude is 1160 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 902 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.

FIG. 1 What a Marylebone roof makes, month by month

What a Marylebone roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 73 kWh per kWpMarApr: 105 kWh per kWpAprMay: 119 kWh per kWpMayJun: 124 kWh per kWpJun124 kWh Jul: 124 kWh per kWpJulAug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 52 kWh per kWpOctNov: 31 kWh per kWpNovDec: 22 kWh per kWpDec

Jun produces 5.6 times what Dec does on the same roof. A 500 kWp array here models at about 451,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb3819,000
Mar7336,500
Apr10552,500
May11959,500
Jun12462,000
Jul12462,000
Aug10552,500
Sep8341,500
Oct5226,000
Nov3115,500
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Marylebone against the rest of Greater London
  • Whitechapel903
  • Camden902
  • Harrow902
  • Islington902
  • Marylebone902
  • Mayfair902
  • Merton902
  • Tottenham902
  • Westminster902

Marylebone ranks 37 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

UK Power Networks operates the distribution network across Greater London, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Marylebone

What would a 500 kWp array produce on a farm near Marylebone?
Yes, and the figure matters more than the sunshine. At 902 kWh per kWp a year, a 500 kWp array on a Marylebone holding models at around 451,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Marylebone?
Applications go to UK Power Networks, who run the network across Greater London. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.