Solar panels for farms in Enfield

Most holdings around Enfield already own the best generating site they will ever have, and it is the roof of the shed they built for something else. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

898 kWh per kWp a year at this latitude, so a 500 kWp array models at about 449,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Enfield
96 m phase 1
Drawing Enfield unit
Roof 96 x 62 m
Array 500 kWp
Yield 449,000 kWh/yr
Scale 1:500 / Rev A / Greater London

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Enfield / Greater London
A modern steel framed agricultural building with its roof covered in solar panels, tractor and trailer in the yard, fields beyond
Industrial stock of the kind we survey across Greater London.

Farm building solar PV across Greater London

What a farm roof near Enfield generates

Modelled irradiation at this latitude is 1155 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 898 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.

FIG. 1 What a Enfield roof makes, month by month

What a Enfield roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 25 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 73 kWh per kWpMarApr: 104 kWh per kWpAprMay: 119 kWh per kWpMayJun: 123 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 104 kWh per kWpAugSep: 83 kWh per kWpSepOct: 51 kWh per kWpOctNov: 30 kWh per kWpNovDec: 22 kWh per kWpDec

Jul produces 5.6 times what Dec does on the same roof. A 500 kWp array here models at about 449,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2512,500
Feb3919,500
Mar7336,500
Apr10452,000
May11959,500
Jun12361,500
Jul12462,000
Aug10452,000
Sep8341,500
Oct5125,500
Nov3015,000
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Enfield against the rest of Greater London
  • Wembley901
  • Hampstead900
  • Highgate900
  • Kentish Town900
  • Barnet899
  • Enfield898
  • Walthamstow898
  • Croydon895
  • Sutton847

Enfield ranks 47 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Enfield

What would a 500 kWp array produce on a farm near Enfield?
Yes, and the figure matters more than the sunshine. At 898 kWh per kWp a year, a 500 kWp array on a Enfield holding models at around 449,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Enfield?
Applications go to UK Power Networks, who run the network across Greater London. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.