Solar panels for farms in Ely
A Ely farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.
904 kWh per kWp a year at this latitude, so a 500 kWp array models at about 452,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in ElyIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Solar for agricultural buildings across Cambridgeshire
What a farm roof near Ely generates
Modelled irradiation at this latitude is 1158 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 904 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.
The planning record lists 4 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 14.7 MW, with the largest at 24 MW. Source: Renewable Energy Planning Database, Q1 2026.
2 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Ely is higher than the record shows.
Surveys run across CB postcodes, CB6 outward.
East Cambridgeshire is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Ely ranks 5 of 8 towns we cover in Cambridgeshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 898 to 908, a spread of 10 kWh per kWp. Within Cambridgeshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Solar already consented near CB6
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Mingay Farm - extension | Octopus Imvetments | 19.3 MW | Ground | Operational |
| Stowbridge Farm | Magnetar Solar | 24 MW | Ground | Operational |
| Stowbridge Farm - Extension (Phase 2) | FC Palmer and Sons | 10 MW | Ground | Operational |
| Stowbridge Farm - Extension (Phase 1) | FC Palmer & Sons Ltd | 10 MW | Ground | Operational |
| The Harbour School, Station Road - Solar Panels & ASHP | Cambridge Meridian Academies Trust | 0.9 MW | Roof | Awaiting Construction |
| Lees Packhouse, The Gault - Solar PV System | BeBa Energy UK Limited | 0.27 MW | Roof | Awaiting Construction |
Grid connection through UK Power Networks
UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Across Cambridgeshire the planning database records 172 solar schemes totalling 2422 MW, of which 46 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Ely
- Is there enough sun around Ely to make this work?
- Modelled at 904 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 452,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export near Ely?
- Only UK Power Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
- Do we need planning permission in East Cambridgeshire?
- In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with East Cambridgeshire either way.
- Has anyone near CB6 already done this?
- The planning database records 4 ground mounted and 2 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.