farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Chesham

Around Chesham the constraint is rarely the roof. It is the incoming supply and what the network will accept back. The survey starts on the covering: fibre cement or steel, its remaining life, the purlin spacing and what the frame will carry.

891 kWh per kWp a year at this latitude, so a 500 kWp array models at about 446,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Chesham
96 m phase 1
Drawing Chesham unit
Roof 96 x 62 m
Array 500 kWp
Yield 446,000 kWh/yr
Scale 1:500 / Rev A / HP5

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Chesham / Buckinghamshire
South East farmland with solar arrays on farm buildings
Industrial stock of the kind we survey across South East.

Solar for agricultural buildings across Buckinghamshire

What a farm roof near Chesham generates

Modelled irradiation at this latitude is 1142 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 891 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Chesham is higher than the record shows.

Surveys run across HP postcodes, HP5 outward.

Buckinghamshire is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Chesham roof makes, month by month

What a Chesham roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 72 kWh per kWpMarApr: 103 kWh per kWpAprMay: 118 kWh per kWpMayJun: 123 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 105 kWh per kWpAugSep: 82 kWh per kWpSepOct: 50 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 446,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3819,000
Mar7236,000
Apr10351,500
May11859,000
Jun12361,500
Jul12462,000
Aug10552,500
Sep8241,000
Oct5025,000
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Chesham against the rest of Buckinghamshire
  • Marlow904
  • Buckingham893
  • High Wycombe892
  • Beaconsfield892
  • Chesham891
  • Amersham890
  • Princes Risborough883
  • Aylesbury881

Chesham ranks 5 of 8 towns we cover in Buckinghamshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 881 to 904, a spread of 23 kWh per kWp. Within Buckinghamshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Scottish and Southern Electricity Networks

Connections around Chesham are handled by Scottish and Southern Electricity Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Buckinghamshire the planning database records 127 solar schemes totalling 955 MW, of which 21 are operational (REPD Q1 2026).

Solar already consented near HP5

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Bellingdon Brickworks, Chesham Road - Solar Panels H G Matthews 0.33 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Chesham

Is there enough sun around Chesham to make this work?
Modelled at 891 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 446,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export near Chesham?
Only Scottish and Southern Electricity Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
Do we need planning permission in Buckinghamshire?
In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Buckinghamshire either way.

Nearby

All Buckinghamshire locations