Solar panels for farms in Bedminster
Farm buildings around Bedminster carry broad, shallow roofs that were put up for storage and stock, not for generation. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
906 kWh per kWp a year at this latitude, so a 500 kWp array models at about 453,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in BedminsterIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Bristol
What a farm roof near Bedminster generates
Modelled irradiation at this latitude is 1158 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 906 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.
No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.
Bedminster ranks 2 of 5 towns we cover in Bristol on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 895 to 908, a spread of 13 kWh per kWp. Within Bristol that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through National Grid Electricity Distribution
Connections around Bedminster are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Bedminster
- What would a 500 kWp array produce on a farm near Bedminster?
- Yes, and the figure matters more than the sunshine. At 906 kWh per kWp a year, a 500 kWp array on a Bedminster holding models at around 453,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Which network operator handles the connection around Bedminster?
- Applications go to National Grid Electricity Distribution, who run the network across Bristol. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.