Farm solar panels across Bristol
We survey farm and agricultural building roofs throughout Bristol, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 903 kWh/kWp/yr
- Mean across Bristol towns, EU PVGIS v5.2
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Solar on record
- 0 schemes / 0 MW
- REPD Q1 2026, 0 operational
- Towns covered
- 2
- Surveys arranged county wide
What the data says about Bristol
Modelled yield is consistent across Bristol, from 895 kWh per kWp a year at Filton to 908 at Bishopston. At that spread, where the holding sits is not what decides the scheme. Your own demand pattern is.
Across the districts we cover in Bristol the planning record lists 1 ground mounted and 7 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.
- Keynsham 902 kWh/kWp
- Filton 895 kWh/kWp
- Bedminster 906 kWh/kWp
- Bishopston 908 kWh/kWp
- Bristol City Centre
- Hengrove 903 kWh/kWp
Book a survey in Bristol
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.