Solar panels for farms in Salisbury
Most holdings around Salisbury already own the best generating site they will ever have, and it is the roof of the shed they built for something else. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
923 kWh per kWp a year at this latitude, so a 500 kWp array models at about 462,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in SalisburyIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Wiltshire
What a farm roof near Salisbury generates
Modelled irradiation at this latitude is 1182 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 923 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 4 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.
5 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Salisbury is higher than the record shows.
We survey holdings across the SP postcode area, starting from SP2.
Wiltshire is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Salisbury ranks 1 of 8 towns we cover in Wiltshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 894 to 923, a spread of 29 kWh per kWp. Within Wiltshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Solar already consented near SP2
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Salisbury City Hall - Solar PV Panels | Wiltshire Council | 0.18 MW | Roof | Awaiting Construction |
| Salisbury District Hospital, Odstock Road - Solar Panels | Salisbury NHS Foundation Trust | 0.76 MW | Roof | Awaiting Construction |
| Salisbury District Hospital, Odstock Road - Solar Panels | Salisbury NHS Foundation Trust | 0.19 MW | Roof | Awaiting Construction |
| Salisbury District Hospital, Odstock Road - Solar PV | Salisbury NHS Foundation Trust | 0.26 MW | Roof | Awaiting Construction |
| The Salisbury Hospice, Salisbury District Hospital - Solar PV Panels | Salisbury NHS Foundation Trust | 0.21 MW | Roof | Application Submitted |
Grid connection through Scottish and Southern Electricity Networks
Scottish and Southern Electricity Networks operates the distribution network across Wiltshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Across Wiltshire the planning database records 159 solar schemes totalling 1585 MW, of which 56 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Salisbury
- How much does a farm roof near Salisbury generate?
- The model gives 923 kWh for every kWp installed here, so 500 kWp comes out at about 462,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Will the rural network around Salisbury take the export?
- Scottish and Southern Electricity Networks is the distribution network operator for Wiltshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
- Is planning permission needed for panels on a farm building near Salisbury?
- Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Wiltshire before design sign-off.
- Has anyone near SP2 already done this?
- The planning database records 0 ground mounted and 5 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.