farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Farm solar panels across West Midlands

We survey farm and agricultural building roofs throughout West Midlands, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.

Modelled yield
853 kWh/kWp/yr
Mean across West Midlands towns, EU PVGIS v5.2
Network operator
National Grid Electricity Distribution
G99 applications and export limits
Solar on record
195 schemes / 533 MW
REPD Q1 2026, 3 operational
Towns covered
7
Surveys arranged county wide

What the data says about West Midlands

Modelled yield is not flat across West Midlands. Coventry comes out at 868 kWh per kWp a year against 839 at Wolverhampton, a spread of 29 kWh per kWp. On a 200 kWp farm array that difference is about 5,800 kWh a year, which is worth checking before accepting a generic saving figure.

Across the districts we cover in West Midlands the planning record lists 0 ground mounted and 17 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.

Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.

Towns in West Midlands

Book a survey in West Midlands

Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

All UK locations