farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Farm solar panels across Warwickshire

We survey farm and agricultural building roofs throughout Warwickshire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.

Modelled yield
878 kWh/kWp/yr
Mean across Warwickshire towns, EU PVGIS v5.2
Network operator
National Grid Electricity Distribution
G99 applications and export limits
Solar on record
94 schemes / 1201 MW
REPD Q1 2026, 18 operational
Towns covered
6
Surveys arranged county wide

What the data says about Warwickshire

Modelled yield is not flat across Warwickshire. Stratford-upon-Avon comes out at 893 kWh per kWp a year against 866 at Bedworth, a spread of 27 kWh per kWp. On a 200 kWp farm array that difference is about 5,400 kWh a year, which is worth checking before accepting a generic saving figure.

Across the districts we cover in Warwickshire the planning record lists 12 ground mounted and 9 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.

Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.

Towns in Warwickshire

Book a survey in Warwickshire

Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

All UK locations