farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Swansea City Centre

The case for solar on a Swansea City Centre holding turns on how much of the output the farm uses itself, not on how much the roof makes. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

Book a roof survey in Swansea City Centre
96 m phase 1
Drawing Swansea City Centre unit
Roof 96 x 62 m
Array 420 kWp
Yield 380,000 kWh/yr
Scale 1:500 / Rev A / Swansea

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Swansea City Centre / Swansea
A modern steel framed agricultural building with its roof covered in solar panels, tractor and trailer in the yard, fields beyond
Industrial stock of the kind we survey across Swansea.

Agricultural rooftop solar across Swansea

No solar scheme is recorded in this postcode district in the planning database. On a farm that usually means nothing has been built above the reporting threshold rather than that nothing has been built, because a roof array on a shed rarely appears in it.

FIG. 1 What a Swansea City Centre roof makes, month by month
Source: EU PVGIS v5.2
FIG. 2 Swansea City Centre against the rest of Swansea
  • Mumbles921
  • Sketty921
  • Morriston899
  • Neath881

Swansea City Centre ranks 0 of 4 towns we cover in Swansea on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 881 to 921, a spread of 40 kWh per kWp. Within Swansea that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Swansea, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Swansea City Centre

Which network operator handles the connection around Swansea City Centre?
Applications go to National Grid Electricity Distribution, who run the network across Swansea. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.