Farm solar panels across Surrey
We survey farm and agricultural building roofs throughout Surrey, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 907 kWh/kWp/yr
- Mean across Surrey towns, EU PVGIS v5.2
- Network operator
- UK Power Networks
- G99 applications and export limits
- Solar on record
- 74 schemes / 182 MW
- REPD Q1 2026, 6 operational
- Towns covered
- 8
- Surveys arranged county wide
What the data says about Surrey
Modelled yield is consistent across Surrey, from 900 kWh per kWp a year at Epsom to 916 at Redhill. At that spread, where the holding sits is not what decides the scheme. Your own demand pattern is.
Across the districts we cover in Surrey the planning record lists 0 ground mounted and 24 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through UK Power Networks. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.
- Guildford 908 kWh/kWp
- Woking 905 kWh/kWp
- Camberley 900 kWh/kWp
- Epsom 900 kWh/kWp
- Redhill 916 kWh/kWp
- Farnham 903 kWh/kWp
- Dorking 916 kWh/kWp
- Weybridge 905 kWh/kWp
- Leatherhead 910 kWh/kWp
- Staines 903 kWh/kWp
Book a survey in Surrey
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.