Solar panels for farms in Sudbury
Farm buildings around Sudbury carry broad, shallow roofs that were put up for storage and stock, not for generation. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
923 kWh per kWp a year at this latitude, so a 500 kWp array models at about 462,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in SudburyIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Suffolk
What a farm roof near Sudbury generates
Modelled irradiation at this latitude is 1180 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 923 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 4 percent above the mean across the areas we cover, which is as strong as UK farm rooftop gets outside the south coast.
The planning record lists 5 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 24 MW, with the largest at 49.99 MW. Source: Renewable Energy Planning Database, Q1 2026.
1 roof mounted scheme is on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Sudbury is higher than the record shows.
We survey holdings across the CO postcode area, starting from CO10.
Braintree is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Sudbury ranks 5 of 8 towns we cover in Suffolk on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 905 to 956, a spread of 51 kWh per kWp. On a 500 kWp array that is about 25,500 kWh a year between the strongest and weakest town in the county.
Solar already consented near CO10
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Rogers Farm | Sun & Soil | 15 MW | Ground | Appeal Refused |
| Pentlow Hill | Nextpower SPV 11 Limited | 24 MW | Ground | Operational |
| Cutbush Farm, Belchamp St Paul - Solar Array | British Solar Renewables | 49.99 MW | Ground | Under Construction |
| Northern Road, Chilton Industrial Estate - Solar Park | JCS Hi-Torque Limited | 0.69 MW | Ground | Awaiting Construction |
| Water Hall Farm, Waterhall Road - Solar Farm | Bluefield Renewable Developments Limited | 35 MW | Ground | Awaiting Construction |
| Brundon Lane - Solar Panels | ASR Limited | 0.27 MW | Roof | Awaiting Construction |
Grid connection through UK Power Networks
UK Power Networks operates the distribution network across Suffolk, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Across Suffolk the planning database records 118 solar schemes totalling 1369 MW, of which 23 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Sudbury
- Is there enough sun around Sudbury to make this work?
- Modelled at 923 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 462,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once ridge vents and walkways are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export near Sudbury?
- Only UK Power Networks can answer it for your connection, and on rural feeders the answer varies farm to farm. An export-limited offer usually still works, because a holding with grain drying, cooling or ventilation uses most of what it makes.
- Do we need planning permission in Braintree?
- In most cases no, because panels on the roof of an agricultural building usually sit within permitted development. The exceptions are listed buildings, conservation areas, protected landscapes and arrays that stand proud of the roof. We check with Braintree either way.
- Has anyone near CO10 already done this?
- The planning database records 5 ground mounted and 1 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.