farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Newcastle-under-Lyme

The case for solar on a Newcastle-under-Lyme holding turns on how much of the output the farm uses itself, not on how much the roof makes. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.

826 kWh per kWp a year at this latitude, so a 500 kWp array models at about 413,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Newcastle-under-Lyme
96 m phase 1
Drawing Newcastle-under-Lyme unit
Roof 96 x 62 m
Array 500 kWp
Yield 413,000 kWh/yr
Scale 1:500 / Rev A / ST5

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Newcastle-under-Lyme / Staffordshire
Midlands arable farmland with solar on farm building roofs
Industrial stock of the kind we survey across West Midlands.

Farm building solar PV across Staffordshire

What a farm roof near Newcastle-under-Lyme generates

Modelled irradiation at this latitude is 1056 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 826 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.

The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 4.4 MW. Source: Renewable Energy Planning Database, Q1 2026.

5 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Newcastle-under-Lyme is higher than the record shows.

We survey holdings across the ST postcode area, starting from ST5.

Newcastle-under-Lyme is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Newcastle-under-Lyme roof makes, month by month

What a Newcastle-under-Lyme roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

0255075100Jan: 19 kWh per kWpJanFeb: 35 kWh per kWpFebMar: 67 kWh per kWpMarApr: 98 kWh per kWpAprMay: 115 kWh per kWpMay115 kWh Jun: 115 kWh per kWpJunJul: 115 kWh per kWpJulAug: 98 kWh per kWpAugSep: 76 kWh per kWpSepOct: 45 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

May produces 6.4 times what Dec does on the same roof. A 500 kWp array here models at about 413,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan199,500
Feb3517,500
Mar6733,500
Apr9849,000
May11557,500
Jun11557,500
Jul11557,500
Aug9849,000
Sep7638,000
Oct4522,500
Nov2613,000
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Newcastle-under-Lyme against the rest of Staffordshire
  • Tamworth857
  • Lichfield857
  • Burton upon Trent852
  • Stafford842
  • Cannock842
  • Stoke-on-Trent833
  • Newcastle-under-Lyme826

Newcastle-under-Lyme ranks 7 of 7 towns we cover in Staffordshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 826 to 857, a spread of 31 kWh per kWp. Within Staffordshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Staffordshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Staffordshire the planning database records 118 solar schemes totalling 1054 MW, of which 17 are operational (REPD Q1 2026).

Solar already consented near ST5

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Keele University Keele University 4.4 MW Ground Operational
Bradwell Hall Nursing Home, Old Hall Drive - Solar Panels Bradwell Nursing Home Limited 0.24 MW Roof Awaiting Construction
Tree Of Life, Coaldale Road - Solar Panels Columbia Threadneedle 0.5 MW Roof Awaiting Construction
The 4 Candles, High Street - Solar Panel DCMS n/a Roof Awaiting Construction
Forfarmers, Speedwell Road- Solar Panels ForFarmers 0.33 MW Roof Awaiting Construction
Bradwell Hospital,Talke Road - Solar Panels Midlands Partnership Foundation Trust n/a Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Newcastle-under-Lyme

What would a 500 kWp array produce on a farm near Newcastle-under-Lyme?
Yes, and the figure matters more than the sunshine. At 826 kWh per kWp a year, a 500 kWp array on a Newcastle-under-Lyme holding models at around 413,000 kWh. What changes the answer is how much of that the farm uses itself. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection around Newcastle-under-Lyme?
Applications go to National Grid Electricity Distribution, who run the network across Staffordshire. On a farm the incoming supply matters as much as their answer: a single phase supply caps what can be installed whatever the roof would take.
What does Newcastle-under-Lyme require for solar on an agricultural building?
Roof-mounted panels on an agricultural building often fall under permitted development, subject to limits on projection above the roof plane and to the building not being listed or in a conservation area or National Park. We confirm the position with Newcastle-under-Lyme before the design is finalised.
Has anyone near ST5 already done this?
The planning database records 1 ground mounted and 5 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Staffordshire locations