Farm solar panels across Powys
We survey farm and agricultural building roofs throughout Powys, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 829 kWh/kWp/yr
- Mean across Powys towns, EU PVGIS v5.2
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Solar on record
- 18 schemes / 39 MW
- REPD Q1 2026, 1 operational
- Towns covered
- 0
- Surveys arranged county wide
What the data says about Powys
Modelled yield is consistent across Powys, from 820 kWh per kWp a year at Newtown to 838 at Hay on Wye. At that spread, where the holding sits is not what decides the scheme. Your own demand pattern is.
The planning record lists no solar schemes for the districts we cover in Powys. On agricultural land that usually reflects the reporting threshold rather than an absence of arrays, because roof mounted schemes on farm buildings seldom appear in it.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.
- Newtown 820 kWh/kWp
- Brecon 828 kWh/kWp
- Builth Wells 830 kWh/kWp
- Hay on Wye 838 kWh/kWp
- Llandrindod Wells 825 kWh/kWp
- Welshpool 831 kWh/kWp
Book a survey in Powys
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.