Solar panels for farms in Blyth
Most holdings around Blyth already own the best generating site they will ever have, and it is the roof of the shed they built for something else. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.
848 kWh per kWp a year at this latitude, so a 500 kWp array models at about 424,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in BlythIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Agricultural rooftop solar across Northumberland
What a farm roof near Blyth generates
Modelled irradiation at this latitude is 1078 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 848 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 4 percent below the mean across the areas we cover, so the case here rests on using the output on the holding rather than exporting it.
The planning record lists 2 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 26.1 MW, with the largest at 49.99 MW. Source: Renewable Energy Planning Database, Q1 2026.
3 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Blyth is higher than the record shows.
Most of the buildings we look at here sit in the NE postcode area.
Northumberland is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Blyth ranks 1 of 6 towns we cover in Northumberland on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 803 to 848, a spread of 45 kWh per kWp. On a 500 kWp array that is about 22,500 kWh a year between the strongest and weakest town in the county.
Grid connection through Northern Powergrid
Northern Powergrid operates the distribution network across Northumberland, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Across Northumberland the planning database records 38 solar schemes totalling 276 MW, of which 2 are operational (REPD Q1 2026).
Solar already consented near NE24
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Blyth Sewage Treatment Works | Northumbrian Water Limited Head Office | 2.3 MW | Ground | Operational |
| Low Horton Farm - Solar Farm | Bluefield Renewable Developments Limited | 49.99 MW | Ground | Awaiting Construction |
| Factory C, Coniston Road - Roof repairs & PV Array | Burberry Limited | n/a | Roof | Application Submitted |
| Bede Academy North, Sixth Avenue - Solar PV Panels | Emmanuel Schools Foundation | 0.45 MW | Roof | Awaiting Construction |
| Blyth Academy, Chase Farm Drive - Solar Panels | Solar Options for Schools Limited | 0.61 MW | Roof | Awaiting Construction |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Blyth
- How much does a farm roof near Blyth generate?
- The model gives 848 kWh for every kWp installed here, so 500 kWp comes out at about 424,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Will the rural network around Blyth take the export?
- Northern Powergrid is the distribution network operator for Northumberland. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
- Is planning permission needed for panels on a farm building near Blyth?
- Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Northumberland before design sign-off.
- Has anyone near NE24 already done this?
- The planning database records 2 ground mounted and 3 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.