Farm solar panels across Northamptonshire
We survey farm and agricultural building roofs throughout Northamptonshire, model what each one can carry, and arrange the design, the grid application and the install through our MCS-certified partner.
- Modelled yield
- 895 kWh/kWp/yr
- Mean across Northamptonshire towns, EU PVGIS v5.2
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Solar on record
- 133 schemes / 1932 MW
- REPD Q1 2026, 25 operational
- Towns covered
- 7
- Surveys arranged county wide
What the data says about Northamptonshire
Modelled yield is consistent across Northamptonshire, from 890 kWh per kWp a year at Daventry to 900 at Rushden. At that spread, where the holding sits is not what decides the scheme. Your own demand pattern is.
Across the districts we cover in Northamptonshire the planning record lists 9 ground mounted and 19 roof mounted solar schemes. Ground mounted schemes tell you how the network here has treated field arrays; roof mounted ones are undercounted, because an array on a farm building rarely passes the reporting threshold. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on rural feeders the incoming supply is often the real limit: a single phase supply caps the array whatever the roof would carry.
- Northampton 893 kWh/kWp
- Corby 892 kWh/kWp
- Kettering 895 kWh/kWp
- Wellingborough 896 kWh/kWp
- Rushden 900 kWh/kWp
- Daventry 890 kWh/kWp
- Towcester 897 kWh/kWp
Book a survey in Northamptonshire
Send the postcode and the rough footprint. We come back with what the roof can carry, what it would generate against your consumption, and what the funding routes look like.