farmsolarpanels Solar for farm buildings, UK wide Book a roof survey

Solar panels for farms in Lincoln

A Lincoln farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. What decides a farm scheme here is the state of the roof sheets and the incoming supply, which is why the survey looks at both before anyone sizes an array.

882 kWh per kWp a year at this latitude, so a 500 kWp array models at about 441,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Lincoln
96 m phase 1
Drawing Lincoln unit
Roof 96 x 62 m
Array 500 kWp
Yield 441,000 kWh/yr
Scale 1:500 / Rev A / LN6

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Lincoln / Lincolnshire
Midlands arable farmland with solar on farm building roofs
Industrial stock of the kind we survey across East Midlands.

Agricultural rooftop solar across Lincolnshire

What a farm roof near Lincoln generates

Modelled irradiation at this latitude is 1127 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 882 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.

The planning record lists 1 ground mounted solar scheme in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 0.4 MW. Source: Renewable Energy Planning Database, Q1 2026.

4 roof mounted schemes are on record nearby. Roof arrays under a megawatt frequently never reach that database at all, so the real number of farm roofs generating around Lincoln is higher than the record shows.

Most of the buildings we look at here sit in the LN postcode area.

Lincoln is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.

FIG. 1 What a Lincoln roof makes, month by month

What a Lincoln roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 22 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 72 kWh per kWpMarApr: 103 kWh per kWpAprMay: 122 kWh per kWpMay122 kWh Jun: 119 kWh per kWpJunJul: 122 kWh per kWpJulAug: 105 kWh per kWpAugSep: 81 kWh per kWpSepOct: 50 kWh per kWpOctNov: 29 kWh per kWpNovDec: 19 kWh per kWpDec

May produces 6.4 times what Dec does on the same roof. A 500 kWp array here models at about 441,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2211,000
Feb3718,500
Mar7236,000
Apr10351,500
May12261,000
Jun11959,500
Jul12261,000
Aug10552,500
Sep8140,500
Oct5025,000
Nov2914,500
Dec199,500
Source: EU PVGIS v5.2
FIG. 2 Lincoln against the rest of Lincolnshire
  • Boston906
  • Spalding902
  • Sleaford898
  • Stamford896
  • Skegness894
  • Grantham886
  • Lincoln882
  • Gainsborough861

Lincoln ranks 7 of 8 towns we cover in Lincolnshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 861 to 906, a spread of 45 kWh per kWp. On a 500 kWp array that is about 22,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through National Grid Electricity Distribution

Connections around Lincoln are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a farm uses most of what the roof makes during the working day.

Across Lincolnshire the planning database records 226 solar schemes totalling 7052 MW, of which 37 are operational (REPD Q1 2026).

Solar already consented near LN6

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Noble Foods, Hives Lane - Solar Panels Noble Foods Limited 0.37 MW Ground Awaiting Construction
Clay Farm, South Scarle Lane - Solar Panels GHC Farms Pension Scheme 0.55 MW Roof Awaiting Construction
Cargill & Frontier Agriculture, Camp Road - Solar Panels BeBa Energy UK Limited 0.36 MW Roof Awaiting Construction
Swinderby Quarry - Solar PV Array CEMEX UK Properties 1.2 MW Roof Awaiting Construction
North Kesteven Sports Centre, Moor Lane - Solar PV Panels North Kesteven District Council 0.17 MW Roof Awaiting Construction
Whisby Quarry, Eagle Road - Solar Array Conrad Energy 18 MW Floating Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Lincoln

How much does a farm roof near Lincoln generate?
The model gives 882 kWh for every kWp installed here, so 500 kWp comes out at about 441,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Will the rural network around Lincoln take the export?
National Grid Electricity Distribution is the distribution network operator for Lincolnshire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
Is planning permission needed for panels on a farm building near Lincoln?
Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Lincoln before design sign-off.
Has anyone near LN6 already done this?
The planning database records 1 ground mounted and 4 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Lincolnshire locations