Solar panels for farms in Cirencester
A Cirencester farm buys electricity at the worst rate of the day in exactly the hours its roof could be generating. Each survey records the sheet type and condition, the usable area once rooflights and vents come out, and whether the supply is single or three phase.
892 kWh per kWp a year at this latitude, so a 500 kWp array models at about 446,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in CirencesterIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Farm building solar PV across Gloucestershire
What a farm roof near Cirencester generates
Modelled irradiation at this latitude is 1142 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 892 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the areas we cover, so what decides the scheme is your own demand pattern rather than the latitude.
The planning record lists 6 ground mounted solar schemes in this postcode district, which is a fair guide to how the local network has treated field arrays. The typical consented scheme in this district is about 21.5 MW, with the largest at 49.9 MW. Source: Renewable Energy Planning Database, Q1 2026.
We survey holdings across the GL postcode area, starting from GL7.
Cotswold is the planning authority for most holdings here, and it is the authority that decides whether an array on an agricultural building falls inside permitted development.
Cirencester ranks 2 of 6 towns we cover in Gloucestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 870 to 905, a spread of 35 kWh per kWp. Within Gloucestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Grid connection through National Grid Electricity Distribution
National Grid Electricity Distribution operates the distribution network across Gloucestershire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Across Gloucestershire the planning database records 207 solar schemes totalling 1592 MW, of which 39 are operational (REPD Q1 2026).
Solar already consented near GL7
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Kencot Hill Solar Farm | Foresight Solar Fund Limited | 37 MW | Ground | Operational |
| Cirencester Solar Farm | Warrington Borough Council / Statkraft | 23 MW | Ground | Operational |
| Duke Of Gloucester Barracks | Ministry of Defence | 1.4 MW | Ground | Operational |
| Kemble Wick | Aura Power | 49.9 MW | Ground | Operational |
| Siddington Solar Farm | Gresham House / Anesco Limited | 19.94 MW | Ground | Under Construction |
| Welsh Way - Solar PV Farm | Innova Renewables | 13 MW | Ground | Awaiting Construction |
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Cirencester
- How much does a farm roof near Cirencester generate?
- The model gives 892 kWh for every kWp installed here, so 500 kWp comes out at about 446,000 kWh a year before shading losses. A building of roughly 1,485 sqm of clear roof carries it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Will the rural network around Cirencester take the export?
- National Grid Electricity Distribution is the distribution network operator for Gloucestershire. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. Rural supplies are often the binding constraint, so we ask the question before an array is sized.
- Is planning permission needed for panels on a farm building near Cirencester?
- Usually permitted development covers a roof array. Ground mounted arrays are a different question and are far more likely to need a full application. We put both to Cotswold before design sign-off.
- Has anyone near GL7 already done this?
- The planning database records 6 ground mounted and 0 roof mounted solar schemes in this postcode district. That matters less as proof it works and more as evidence of how the local network has treated export applications. Roof arrays under a megawatt often never appear in the database, so the real figure is higher. Source: Renewable Energy Planning Database, Q1 2026.